Tooling Risk Assessment Skill
Cutting steel converts design uncertainty into cash at the worst exchange rate in hardware. This skill assesses a tooling decision the way a seasoned NPI/ME lead does: match tool class to forecast confidence, do the cavitation math against peak demand, put the T1→T2→T3 timeline on the calendar, price the "what if the design changes after tooling" scenario honestly, and write the kill criteria before the money moves.
What This Skill Produces
- A soft vs hard tooling recommendation per part, with the tradeoff shown
- Cavitation and capacity math against the forecast ramp
- A T1 sample timeline with tuning-loop buffer
- An ECO-after-tooling cost narrative (steel-safe vs weld territory)
- Explicit kill criteria and total capital-at-risk summary
Required Inputs
Ask for these if not provided; if forecast confidence is unstated, assume it is low and label the assumption:
- Part list going to tool — which parts, materials, cosmetic surfaces
- Forecast — peak monthly/weekly demand and lifetime volume, with confidence
- Design maturity — which build validated this geometry (pre-EVT? post-DVT?)
- Cycle time estimates and target resin(s)
- Tooling quotes if in hand — cost, cavitation, steel type, lead time
- Hard dates — launch window that the T1 timeline must serve
Tooling Framework
Tool class tradeoff:
| | Soft tool (Al / P20 unhardened) | Hard tool (P20/H13 hardened steel) |
|---|---|---|
| Life | ~5k–100k shots | ~500k–1M+ shots |
| Lead time to T1 | ~3–6 weeks | ~8–12 weeks |
| Cost | ~30–50% of hard tool | Full cost |
| Change tolerance | Cheap to modify or scrap | Expensive; welds risk cosmetic surfaces |
| Right when | Design still moving; bridge builds; low lifetime volume | Design frozen post-DVT; high volume |
Cavitation math — show the work: parts/week/cavity = (3600 ÷ cycle-time-s) × press-hours/week × yield. Cavities needed = peak weekly demand ÷ parts/week/cavity, rounded up, plus a stated overhead for maintenance downtime. Sanity-check tool life: lifetime volume ÷ cavities vs shots-of-life; flag if a second tool is inevitable and when.
T1 timeline — T1 (first shots) at tool lead time; plan 2–3 tuning loops (T1→T2→T3) at ~2–3 weeks each for texture, warp, sink, and dimensional tuning. Cosmetic A-surfaces rarely pass at T1; do not let the schedule assume they will.
ECO-after-tooling narrative — classify the plausible changes: steel-safe (change removes steel / adds plastic — days, cheap), weld/re-machine (adds steel — weeks, risky on cosmetic surfaces), new insert or new tool (geometry change beyond repair — re-quote the lead time). State which open design questions land in which class.
Output Format
Tooling risk assessment: [product / part set]
- Recommendation — tool class per part, cavitation, when to kick off, capital at risk
- Forecast basis — the numbers used and their confidence
[assumed]where inferred - Capacity math — the cavitation calculation shown, tool-life check
- Timeline — kickoff → T1 → T2/T3 loops → parts for [build], vs the hard date
- Change-risk narrative — open design questions mapped to steel-safe / weld / new-tool cost
- Kill criteria — the specific findings (e.g. DVT reliability failure in a tooled part, forecast cut below X, cert failure implicating geometry) that stop or re-scope the tooling spend
- Risk register — remaining risks with owner and trigger date
Quality Checks
- [ ] Cavitation math is shown, not asserted, and uses peak demand — not average
- [ ] Tool life is checked against lifetime volume per cavity
- [ ] The timeline includes tuning loops, not just T1
- [ ] Every open design question is mapped to an ECO cost class
- [ ] Kill criteria are specific and dated — someone could actually invoke them
- [ ] Capital at risk is totalled, including tools that may be scrapped
Anti-Patterns
- [ ] Do not size cavitation on average demand — peak week plus downtime overhead or the launch starves
- [ ] Do not cut hard tools on a design that has not survived its reliability testing — that is buying a very expensive opinion
- [ ] Do not let the schedule assume T1 parts are shippable — T1 parts are for tuning
- [ ] Do not treat "the factory says it's fine" as a change-risk analysis — classify each open question yourself
- [ ] Do not present a tooling recommendation without kill criteria — the moment to define "stop" is before the spend
- [ ] Do not hide the second-tool moment — if tool life runs out mid-ramp, say when and price it now
想直接用这个技能?
本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。
它属于哪个仓库
exports/openclaw/tooling-risk-assessment/SKILL.md同一个仓库里的其他技能
同名技能的其他版本
有 3 个不同仓库或目录里都有叫 tooling-risk-assessment 的技能。它们内容并不相同,别混用:
- mohitagw15856/pm-claude-skills — Assess an injection-mold or production tooling decision before cutting steel — soft vs har
- mohitagw15856/pm-claude-skills — Assess an injection-mold or production tooling decision before cutting steel — soft vs har