跳到主要内容
知仓学习社ZHICANG

nw-production-readiness

Monitoring, observability, operational procedures, CI/CD lessons learned, and quality gate definitions. Load when assessing production readiness or …

不碰外部(只输出文字)无严重或高危命中nWave-ai/nWave

它会碰到什么

扫了多少1 个文本文件,3 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

Production Readiness

Monitoring and Observability

Application Monitoring

  • Performance: response time | throughput | latency percentiles (P50, P95, P99)
  • Resources: CPU | memory | database connections | cache hit rates
  • Errors: exception tracking | error rate trends | integration failure detection
  • Business: KPI tracking | conversion funnels | feature usage | revenue impact

Infrastructure Monitoring

Server/container health and resource utilization | Network performance and connectivity | Storage capacity and I/O performance | Security event detection.

Alerting Tiers

| Tier | Condition | Response |

|------|-----------|----------|

| Page | Service down, data loss risk, security breach | Immediate response |

| Urgent | Error rate >2x baseline, latency SLA breach | Response within 15 min |

| Warning | Capacity >80%, error rate trending up | Response within 1 hour |

| Info | Deployment complete, metric threshold crossed | Review next business day |

Operational Procedures

Incident Response

  1. Detect: automated alerting identifies issue
  2. Triage: classify severity, assign responder
  3. Communicate: notify stakeholders per severity level
  4. Resolve: apply fix or rollback
  5. Review: post-incident review within 48 hours
  6. Improve: update runbooks and monitoring based on findings

Maintenance Procedures

Regular update and patching schedule | Backup verification (test restores quarterly) | Security vulnerability scanning (automated, weekly) | Performance baseline recalibration (after major changes).

Knowledge Transfer

Operational runbooks for common procedures | Architecture documentation with system diagrams | Deployment procedures and configuration management | Troubleshooting guides for known failure modes.

Quality Gates for Production Readiness

Before declaring production-ready, all must pass:

  • [ ] All acceptance tests passing
  • [ ] Unit coverage meets project standard (default: >= 80%)
  • [ ] Integration tests validated
  • [ ] Performance validated under realistic load
  • [ ] Security scan completed (0 critical, 0 high)
  • [ ] Monitoring and alerting configured
  • [ ] Logging structured and searchable
  • [ ] Rollback procedure documented and tested
  • [ ] Runbook created for operational procedures
  • [ ] On-call team trained on new feature

For CI/CD architecture lessons and measurement coupling pitfalls, see cicd-and-deployment skill.

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。

同名技能的其他版本

有 2 个不同仓库或目录里都有叫 nw-production-readiness 的技能。它们内容并不相同,别混用:

  • nWave-ai/nWave — Monitoring, observability, operational procedures, CI/CD lessons learned, and quality gate