跳到主要内容
知仓学习社ZHICANG

product-launch-checklist

Generate a comprehensive pre-launch, launch day, and post-launch checklist for any product release. Use when preparing for a product launch, feature…

不碰外部(只输出文字)无严重或高危命中mohitagw15856/pm-claude-skills

它会碰到什么

扫了多少1 个文本文件,8 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

Product Launch Checklist Skill

Never launch without checking everything. Generate a complete, role-assigned checklist covering pre-launch readiness, launch day execution, and post-launch monitoring.

Proposes Actions

Once the checklist is approved, it can be executed: hand the items to [action-runner](../action-runner/SKILL.md), which previews them (dry-run, risk-rated), runs only what you approve via the connected action MCP (GitHub/Linear/Slack), and records what was done back to the brain. Typical: open an issue per checklist item in the named repo/project (🟡), and post the launch summary to Slack (🔴 — approved individually). This skill proposes; action-runner gates and runs — never silently.

Required Inputs

Ask the user for these if not provided:

  • Launch name and planned launch date
  • Launch tier (1 = major product launch, 2 = significant feature release, 3 = incremental update)
  • Team members and their roles (engineering lead, PM, marketing, support, etc.)
  • Feature description (what is being launched)
  • Rollback capability (can this be feature-flagged or reverted quickly?)

How to Use This Skill

Provide:

  • Launch name and date
  • Launch tier (1 = major, 2 = feature, 3 = incremental)
  • Team members and their roles

The skill generates a tiered checklist. Tier 3 launches use only the Essentials section. Tier 2 adds Marketing & Comms. Tier 1 uses all sections.


Output Format

Launch Checklist — [Feature/Product Name] — Target Date: [Date]

Launch Tier: [1 / 2 / 3]

Launch Owner: [PM Name]

Engineering Lead: [Name]

Go/No-Go Decision By: [Date and time — typically 24 hours before launch]


🔧 PRE-LAUNCH — Engineering & Product (T-2 weeks)

  • [ ] Feature flag created and tested in staging
  • [ ] All acceptance criteria signed off by PM
  • [ ] Code reviewed and merged to main
  • [ ] QA sign-off completed (regression + new feature)
  • [ ] Performance testing completed (load, latency)
  • [ ] Security review completed (if data or auth changes)
  • [ ] Rollback procedure documented and tested
  • [ ] Monitoring and alerting configured
  • [ ] Error logging in place with correct severity levels
  • [ ] Database migrations tested on staging with production data volume

📢 PRE-LAUNCH — Marketing & Comms (T-1 week)

  • [ ] Blog post written, reviewed, and scheduled
  • [ ] In-app announcement or tooltip configured
  • [ ] Email campaign drafted and QA'd
  • [ ] Social media posts drafted and scheduled
  • [ ] Landing page or feature page live in staging
  • [ ] Press outreach sent (Tier 1 only)
  • [ ] Product Hunt / community posts prepared (Tier 1 only)

🎓 PRE-LAUNCH — Sales & Support (T-1 week)

  • [ ] Sales enablement one-pager completed
  • [ ] FAQ document shared with sales and support teams
  • [ ] Help centre articles written and published
  • [ ] Support team demo / training completed
  • [ ] Customer success team briefed on top accounts
  • [ ] Pricing updated (if applicable)
  • [ ] Contracts / ToS updated (if applicable)

📊 PRE-LAUNCH — Analytics (T-1 week)

  • [ ] Analytics events firing correctly in staging
  • [ ] Dashboard configured for launch metrics
  • [ ] Baseline metrics documented
  • [ ] Success criteria documented and shared with team
  • [ ] A/B test configured (if applicable)

✅ GO / NO-GO DECISION — T-24 hours

| Criteria | Status | Owner |

|---|---|---|

| All critical bugs resolved | 🟢 / 🔴 | Eng Lead |

| QA sign-off complete | 🟢 / 🔴 | QA |

| Rollback tested | 🟢 / 🔴 | Eng Lead |

| Help centre articles live | 🟢 / 🔴 | Support |

| Monitoring active | 🟢 / 🔴 | Eng Lead |

| PM sign-off | 🟢 / 🔴 | PM |

Go / No-Go Decision: [GO / NO-GO]

Decision Owner: [PM + Eng Lead jointly]


🚀 LAUNCH DAY

  • [ ] Feature flag enabled for [X%] of users (start low — 5–10%)
  • [ ] Launch confirmed in team Slack/channel
  • [ ] Metrics dashboard open and being monitored
  • [ ] Error rate checked at T+15 min, T+1 hr, T+4 hr
  • [ ] Blog post published / email sent
  • [ ] Social posts live
  • [ ] Support team on standby for first 4 hours
  • [ ] PM available and reachable all day
  • [ ] Feature flag expanded to 50% if T+2hr checks pass
  • [ ] Feature flag expanded to 100% if T+4hr checks pass

📈 POST-LAUNCH (D+7, D+30)

  • [ ] D+7 metrics review: adoption, errors, support tickets
  • [ ] D+7 customer feedback synthesised
  • [ ] Retrospective scheduled
  • [ ] Learnings documented
  • [ ] D+30 success metrics reviewed against targets
  • [ ] Feature flag removed from codebase (clean up)
  • [ ] Follow-up features added to backlog based on feedback

Scoring Rubric (0–40)

Score any output of this skill before handing it over; 32+ is ship-quality.

| Dimension | 0 | 5 | 10 |

|---|---|---|---|

| Tier calibration | No tier stated, or checklist depth obviously mismatched (full Tier 1 ceremony for a copy tweak, or a bare list for a new revenue line) | Tier stated but not justified; some sections included or dropped inconsistently with the tier | Tier stated with the reasoning (pricing, legal, blast radius — not engineering effort), sections match the tier, and any tier disagreement is resolved on record |

| Ownership & timing | Items and gates owned by "the team" or nobody; no dates | Most items have owners but key gates (Go/No-Go, expansions, retro) lack a named individual or a specific time | Every checklist item, gate, and decision has one named individual and a date/time, including the Go/No-Go decision time set ~24h before launch |

| Rollback & staged rollout | No rollback plan, or flag flips to 100% on day one | Rollback documented but untested; staging exists but expansion steps have no pass criteria | Rollback tested with a known revert time ("X minutes, tested on [date]"), flag staged 5–10% → 50% → 100%, and each expansion gated on specific named checks |

| Go/No-Go integrity | No gate, or a gate that is theatre — everything green by default, blocked work checked off | Gate exists with criteria, but blocked items are softened, statuses aspirational, or a NO-GO has no revised plan | Honest statuses (reds shown with blocker and owner), the decision follows the table even when that means slipping, and a NO-GO produces a dated re-gate — plus the retro booked at launch time |

Quality Checks

  • [ ] Launch tier confirmed before generating checklist (scope determines depth)
  • [ ] Go/No-Go decision has a named owner and a specific decision time
  • [ ] Rollback procedure is documented and tested (not just planned)
  • [ ] Feature flag expansion is staged (5% → 50% → 100%), not all-at-once
  • [ ] Post-launch retrospective is scheduled at launch time

Anti-Patterns

  • [ ] Do not apply a Tier 1 checklist to an incremental update — tier the launch appropriately before generating the checklist
  • [ ] Do not launch on a Friday without confirmed weekend engineering coverage
  • [ ] Do not leave the Go/No-Go decision owner as "the team" — it must be a named individual
  • [ ] Do not skip the rollback plan for Tier 1 and 2 launches — know the revert time before going live
  • [ ] Do not close the launch without scheduling the post-launch retrospective — it must be booked at launch time, not after

Guidelines

  • The Go/No-Go decision must have a named owner — "the team" is not an owner
  • Never launch on a Friday unless you have weekend engineering coverage
  • Recommend starting all launches at <10% traffic — even for simple features
  • Document rollback time: "We can revert this in X minutes" should be known before launch

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。

同名技能的其他版本

有 5 个不同仓库或目录里都有叫 product-launch-checklist 的技能。它们内容并不相同,别混用: