Engineering Weekly Report

Produce a weekly engineering status report that a team can send to stakeholders, their engineering manager, and the team itself. The format is fixed week-over-week so readers know exactly where to look — shipping progress at the top, decisions in the middle, risks and next steps at the bottom. The report must be readable in under 2 minutes. Avoid prose walls: use bullet points, status tags, and short tables. If metrics are not provided, leave the metrics section with [data needed] markers rather than fabricating numbers.

Required Inputs

Ask for these if not already provided:

  • Team name and report period — team name plus week number or date range (e.g., "Platform Team, Week 21, May 12–16")
  • Work items shipped this week — what was completed and released or merged
  • Work items in progress — what is actively being worked on, with rough percent-complete if known
  • Blocked items — what is blocked, who owns the block, and what is needed to unblock
  • Key decisions made — any architecture, process, or priority decisions made this week
  • Decisions needed next week — any decisions that need to be made soon and who needs to make them
  • Risks and escalations — anything that threatens next week's commitments or needs leadership visibility
  • Next week's top priorities — the 3–5 things the team plans to accomplish next week

Optional but useful:

  • Key metrics — reliability (error rate, p99 latency), velocity (story points completed), or other health indicators
  • Team health notes — PTO, new joins, attrition, morale signals worth noting
  • Sprint or iteration number — if the team runs sprints

Output Format


Engineering Weekly Report — [Team Name]

Week: [Week Number] | [Date Range, e.g., May 12–16, 2025]

Author: [Name or Team Lead]

Distribution: [e.g., Eng leadership, Product, Team]


Shipping Progress

Shipped This Week

| Item | Description | Impact |

|------|-------------|--------|

| [Feature / Fix / Infra change] | [One-line description] | [Who benefits / what it unblocks] |

| [Feature / Fix / Infra change] | [One-line description] | [Who benefits / what it unblocks] |

| [Feature / Fix / Infra change] | [One-line description] | [Who benefits / what it unblocks] |

In Progress

| Item | Owner | Status | Target Ship |

|------|-------|--------|-------------|

| [Work item] | [Name] | [~40% / On Track / At Risk] | [Date or Sprint] |

| [Work item] | [Name] | [~70% / On Track / At Risk] | [Date or Sprint] |

| [Work item] | [Name] | [~20% / On Track / At Risk] | [Date or Sprint] |

Blocked

| Item | Blocked Since | Blocker Description | Owner | Needed To Unblock |

|------|--------------|--------------------|----|-------------------|

| [Work item] | [Date] | [What is blocking progress] | [Name] | [Specific ask — decision, resource, dependency] |

If no items are blocked: No active blockers.


Key Metrics

Metrics reported as of [Date]. Prior week in parentheses.

| Metric | This Week | Last Week | Trend | Target |

|--------|-----------|-----------|-------|--------|

| Error rate (5xx) | [X%] | [X%] | [↑ / ↓ / →] | < [threshold] |

| p99 latency | [Xms] | [Xms] | [↑ / ↓ / →] | < [threshold] |

| Deployment frequency | [X deploys] | [X deploys] | [↑ / ↓ / →] | [target] |

| Story points completed | [X] | [X] | [↑ / ↓ / →] | [sprint target] |

| On-call page volume | [X pages] | [X pages] | [↑ / ↓ / →] | < [threshold] |

Metrics notes: [Any context that makes the numbers meaningful — e.g., "Error rate spike on Tuesday tied to downstream dependency outage, resolved by EOD."]

If metrics are not provided: replace table rows with [data needed — provide metric values for this section].


Decisions

Made This Week

| Decision | Rationale | Owner | Stakeholders Informed |

|----------|-----------|-------|----------------------|

| [Decision description] | [Why — 1 sentence] | [Name] | [Yes / No — who] |

| [Decision description] | [Why — 1 sentence] | [Name] | [Yes / No — who] |

If no decisions were made: No major decisions this week.

Needed Next Week

| Decision | Context | Deadline | Decision Owner |

|----------|---------|----------|----------------|

| [What needs to be decided] | [Why it matters, what happens if delayed] | [Date] | [Name or role] |

If no decisions are pending: No decisions pending.


Risks and Escalations

| Risk | Likelihood | Impact | Mitigation | Escalate To |

|------|-----------|--------|-----------|-------------|

| [Risk description] | [High/Med/Low] | [High/Med/Low] | [What we're doing about it] | [Name/role if escalation needed] |

Escalations this week: [Any item that needs immediate leadership attention — call it out explicitly here, do not bury it in a table row. If none: "None."]


Team Health

| Item | Status |

|------|--------|

| Team capacity this week | [X of Y people at full capacity] |

| PTO / out of office | [Names and dates, or "None"] |

| New joins / departures | [Name, role, and date, or "None"] |

| On-call this week | [Name] |

| On-call next week | [Name] |

Team notes: [Any morale, workload, or team dynamic signals worth surfacing — keep this factual and constructive. If nothing to note: omit this line.]


Next Week's Priorities

The [3–5] things this team will ship or meaningfully advance next week.

  1. [Priority item] — [One sentence: what done looks like and who owns it]
  2. [Priority item] — [One sentence: what done looks like and who owns it]
  3. [Priority item] — [One sentence: what done looks like and who owns it]
  4. [Priority item] — [One sentence: what done looks like and who owns it]
  5. [Priority item] — [One sentence: what done looks like and who owns it]

Capacity risk: [If the team is at reduced capacity next week (PTO, incidents, etc.), note it here so stakeholders calibrate expectations.]


Appendix: Sprint Scorecard (if applicable)

| Sprint | Committed | Completed | Completion Rate | Carried Over |

|--------|-----------|-----------|----------------|--------------|

| Sprint [N-1] | [X pts] | [X pts] | [X%] | [X pts] |

| Sprint [N] (current) | [X pts] | [X pts — partial] | [X% at midpoint] | TBD |


Questions or corrections: [Slack channel or email] | Next report: [Date]


Quality Checks

  • [ ] Every blocked item names a specific owner and states what is concretely needed to unblock it — not just "waiting on X"
  • [ ] Decisions-needed table includes a deadline and a named decision owner, not a vague "TBD"
  • [ ] Metrics table is either populated with real numbers or explicitly marked [data needed] — no fabricated metrics
  • [ ] Next week's priorities are written as outcomes ("ship X", "complete Y migration") not as activities ("work on X")
  • [ ] Escalations that need leadership attention are called out explicitly in the Risks section — not just buried in a table row
  • [ ] The entire report is readable in under 2 minutes — if it is longer than one printed page, trim it
  • [ ] Report period (week number and date range) is clearly stated in the header

Anti-Patterns

  • [ ] Do not fabricate metrics — if data is not available, mark the field as [data needed] rather than estimating; stakeholders making decisions on invented numbers is actively harmful
  • [ ] Do not write next week's priorities as activities ("work on X") — they must be outcomes ("ship X", "complete Y migration") so stakeholders can evaluate whether the team delivered
  • [ ] Do not bury escalations inside a risk table row — anything needing leadership attention must be called out explicitly in the Escalations section
  • [ ] Do not list blocked items without naming a specific owner and a concrete unblocking action — "waiting on X" is not a blocker entry, it is a placeholder
  • [ ] Do not write a report that exceeds two printed pages — length signals the author has not done the editorial work of deciding what matters to stakeholders

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。

它属于哪个仓库

星标★ 1,367
本站分层T1
该仓技能数3611
原文件路径plugins/pm-engineering/skills/engineering-weekly-report/SKILL.md

同一个仓库里的其他技能

看这个仓库的全部 3611 个技能

同名技能的其他版本

有 3 个不同仓库或目录里都有叫 engineering-weekly-report 的技能。它们内容并不相同,别混用: