跳到主要内容
知仓学习社ZHICANG

bom-cost-review

Review a bill of materials for cost, risk, and supply exposure — cost rollup, top-10 cost drivers, single-source and EOL risk, MOQ vs forecast misma…

不碰外部(只输出文字)无严重或高危命中mohitagw15856/pm-claude-skills

它会碰到什么

扫了多少1 个文本文件,5 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

BOM Cost Review Skill

A BOM is a list of promises: that each part will be buyable, at that price, at your volume, for the life of the product. This skill reviews a BOM the way a sourcing veteran does — Pareto the cost, flag the single-source and end-of-life traps before they become line-down events, and separate real cost-down candidates from wishful thinking.

What This Skill Produces

  • A cost rollup by commodity class with % of total
  • Top-10 cost drivers (they usually carry 70–80% of BOM cost)
  • Risk flags per line: single-source, lifecycle (EOL/NRND), MOQ mismatch, long lead time
  • A prioritised cost-down candidate list with realistic savings and effort
  • Tariff and logistics sensitivity notes

Required Inputs

Ask for these if not provided; work with a partial BOM if that's all there is, labelling gaps [missing — request from EE/sourcing]:

  • The BOM — part numbers, descriptions, quantities, unit costs (any format; structure it)
  • Annual forecast volume — needed for MOQ math and price-break realism
  • Target BOM cost — what "good" looks like
  • Sourcing detail if available — approved vendors, country of origin, lead times, lifecycle status
  • Product stage — EVT-stage BOMs get design-out suggestions; MP-stage BOMs get negotiation/resourcing ones

Review Framework

1. Rollup. Group into commodity classes (PCBA/semiconductors, passives, display, battery, mechanicals/enclosure, cables & connectors, packaging & accessories). Show cost and % per class, and total vs target with the gap.

2. Pareto. Rank the top-10 lines by extended cost (unit × qty). Everything after these is noise until the big ten are handled.

3. Risk flags — apply per line, worst flag wins:

| Flag | Trigger | Why it matters |

|---|---|---|

| 🔴 Single-source | One qualified vendor, no drop-in alternate | One factory fire from line-down |

| 🔴 EOL / Obsolete | Lifecycle status EOL or last-time-buy announced | Forced redesign or LTB cash outlay |

| 🟠 NRND | Not recommended for new design | Fine now, redesign within product life |

| 🟠 MOQ mismatch | MOQ > ~13 weeks of forecast demand | Cash tied up, scrap risk on ECO |

| 🟠 Long lead | Lead time > 16 weeks | Forecast error becomes shortage |

| 🟡 Custom/tooled part | Custom silicon, tooled mechanical | Switching cost locks the vendor in |

4. Cost-down candidates. For each: the lever (negotiate at volume break / second-source and dual-run / value-engineer spec — e.g. tighter-than-needed tolerance, over-spec'd connector / design-out entirely), estimated saving per unit, effort, and earliest cut-in (which build or ECO).

5. Tariff & logistics sensitivity. Note country of origin concentration, HTS-code exposure for high-value lines, and what a duty change or freight spike does to landed cost.

Output Format

BOM review: [product / revision]

  1. Summary — total BOM cost vs target, gap, one-line verdict
  2. Cost rollup — table by commodity class (cost, % of total)
  3. Top-10 cost drivers — table: part, qty, unit cost, extended cost, % of BOM, flags
  4. Risk register — every 🔴/🟠 line with flag, evidence, and recommended action + owner
  5. Cost-down candidates — ranked table: lever, est. saving/unit, effort, cut-in point, confidence
  6. Tariff/logistics sensitivity — exposure summary and scenarios
  7. Data gaps — lines missing cost, lifecycle, or sourcing data [missing — request]

Quality Checks

  • [ ] Rollup total reconciles with the sum of lines — no silent arithmetic drift
  • [ ] Every top-10 line has a lifecycle and sourcing note, even if [missing — request]
  • [ ] Each cost-down candidate names the lever, the saving, and the cut-in build/ECO
  • [ ] MOQ flags are computed against the stated forecast, not gut feel
  • [ ] Single-source flags distinguish "no alternate exists" from "alternate not yet qualified"

Anti-Patterns

  • [ ] Do not quote unit prices without a volume — a price without its quantity break is fiction
  • [ ] Do not chase pennies on passives while a top-10 line is single-sourced and EOL
  • [ ] Do not claim a cost-down saving without naming the lever and who has to act
  • [ ] Do not treat distributor stock as supply security for a single-source part
  • [ ] Do not ignore custom/tooled parts in risk review — they are the hardest to move
  • [ ] Do not fabricate costs for missing lines — label them and carry the uncertainty into the total

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。

同名技能的其他版本

有 3 个不同仓库或目录里都有叫 bom-cost-review 的技能。它们内容并不相同,别混用: