跳到主要内容
知仓学习社ZHICANG

architectural-programme-brief

Turn a client's wishes into an architectural brief that can actually be designed against — the accommodation schedule, the adjacencies, the budget r…

不碰外部(只输出文字)无严重或高危命中mohitagw15856/pm-claude-skills

它会碰到什么

扫了多少1 个文本文件,6 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

Architectural Programme Brief

Clients brief in rooms and adjectives; buildings are designed from areas, adjacencies and constraints. The gap between the two is where scope creep lives. This converts the conversation into a schedule you can design against, tests the budget against the areas before anyone draws anything, and writes down what the project is not — the single most valuable page in any brief.

What This Skill Produces

  • An accommodation schedule — every space with its area, occupancy, and the activity it must support
  • Adjacency and circulation requirements — what must be near what, what must never be, and the routes between
  • Site and statutory constraints — planning context, access, orientation, services, and known designations
  • Performance requirements — servicing, acoustics, daylight, accessibility, and environmental targets, stated as requirements rather than aspirations
  • The budget and programme reality check — the area total against the budget at a realistic rate, before design begins
  • Explicit exclusions — what this project is not doing, agreed and written down

Required Inputs

Ask for these if not provided:

  • The client and the driver — who they are, and what problem the building is supposed to solve
  • The activities — what will actually happen in the building, by whom, and when
  • The site — location, area, existing structures, access, orientation, and any known designations or constraints
  • The budget and programme — the number they have and the date they need it, however soft
  • The fixed points — anything already decided, promised, or non-negotiable

Framework: Activities Before Rooms, Areas Before Budget

  1. Brief the activity, not the room. 'A place for forty people to eat that empties in twenty minutes' designs better than 'a canteen'. Rooms are a solution; activities are the requirement.
  2. Put an area against everything. An unpriced schedule is a wish list. Areas are what make the budget conversation possible.
  3. Test the budget early and bluntly. Total area at a realistic rate per square metre, against the stated budget. If it does not work, say so in the brief rather than discovering it at tender.
  4. Map adjacencies as a matrix. Must-be-near, must-not-be-near, and the routes people take between them. This is where the plan actually comes from.
  5. Name constraints before they become surprises. Planning context, rights of light, access, ground conditions, services capacity, listed status.
  6. Write the exclusions down and get them agreed. The scope you did not include is only excluded if it is on paper.

Deeper Material

  • [references/worked-example.md](references/worked-example.md) — a community hall whose budget is £461k short of its own accommodation schedule, found before anyone drew a line. Read it when the shape of a good output is unclear, or to calibrate how specific the entries should be.

Output Format

Project brief: [project] · [client] · [date] · rev [n]

Project driver: [the problem the building solves, in one paragraph]

Accommodation schedule

| Space | Activity supported | Area (m²) | Occupancy | Key requirements |

|---|---|---|---|---|

| | | | | |

Net area: [x] m² · Gross (at [n]% circulation/plant): [y] m²

Adjacencies: must be adjacent [pairs] · must be separated [pairs] · key routes [list]

Site & statutory: [location, area, access, orientation, existing structures, designations, planning context, known constraints]

Performance: accessibility [standard] · environmental target [standard/rating] · acoustics [where it matters] · daylight [requirement] · servicing strategy [outline]

Budget check: [y] m² × [rate]/m² = [construction cost estimate] vs stated budget [amount] → [aligned / gap of [amount]]

If there is a gap: [the options — reduce area, change specification, phase, or increase budget]

Programme: [key dates, and whether they are achievable against a realistic consent and construction period]

Explicitly excluded: [what this project does not include — agreed with client on [date]]

Assumptions: [what has been assumed pending information, and what would change if wrong]

Quality Checks

  • [ ] Every space is justified by an activity, not just named
  • [ ] Areas are stated and totalled, gross as well as net
  • [ ] The budget is tested against the area before design begins
  • [ ] Adjacencies are recorded as requirements, not left to the plan
  • [ ] Statutory and site constraints are named rather than assumed away
  • [ ] Exclusions are written down and agreed
  • [ ] Assumptions are flagged with what changes if they turn out wrong

Anti-Patterns

  • Briefing in room names. Locks in a solution before the requirement is understood.
  • A schedule with no areas. Guarantees the budget conversation happens after the design.
  • Deferring the budget test. The gap does not shrink by being discovered later; it just costs more to fix.
  • Aspirations written as requirements. 'Sustainable' is not a requirement; a target rating is.
  • No exclusions page. Every undocumented exclusion becomes a variation.
  • Accepting a programme without testing it. Consent periods are not negotiable by optimism.

Example Trigger Phrases

  • "Write an architectural brief for a new community building"
  • "Help me capture what the client actually needs"
  • "Turn these client notes into a project brief"
  • "Does this budget work for the accommodation they are asking for?"
  • "Write a brief for a house extension"

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。

同名技能的其他版本

有 3 个不同仓库或目录里都有叫 architectural-programme-brief 的技能。它们内容并不相同,别混用: