跳到主要内容
知仓学习社ZHICANG

migrate-bootstrap

>-

执行命令联网无严重或高危命中microsoft/power-platform-skills

它会碰到什么

扫了多少3 个文本文件,37 KB
它会碰到什么执行命令联网
命中总数2 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

> Plugin check: Run node "${PLUGIN_ROOT}/scripts/check-version.js" — if it outputs a message, show it to the user before proceeding.

Migrate a Traditional Power Pages Site from Bootstrap 3 to Bootstrap 5

Guide the user through migrating a traditional / native Power Pages site from Bootstrap 3

to Bootstrap 5. Follow a systematic approach: verify tooling, acquire and back up the site,

assess scope, run the pac pages bootstrap-migrate engine, review the change report, apply

the residual fixes the engine can only flag, upload (which auto-enables the runtime flag),

verify, and validate.

Core Principles

  • Traditional sites only: This skill targets traditional Power Pages sites (Liquid web templates,

.webtemplate.source.html, .html/.aspx/.ascx, *.css, sitesetting.yml). It does NOT

apply to code sites (React/Vue/Angular/Astro) — they are never Bootstrap-3-based. If the target

is a code site, stop and tell the user this skill doesn't apply.

  • The engine does the bulk; you do the residual: pac pages bootstrap-migrate deterministically

applies the well-known class renames. The skill's value is assisting with the **hierarchy / CSS

changes the engine only logs** (see [references/bootstrap-v5-manual-fixes.md](references/bootstrap-v5-manual-fixes.md)).

  • Non-destructive, with a restore point: The engine writes a new <folder>V5 copy and never

edits the source in place. Still, snapshot the source folder (git) before doing anything.

  • Assist and flag — never silently rewrite: Residual fixes are Liquid-aware and can break layouts.

Apply them with per-category consent; when a case is ambiguous (e.g. Liquid conditionals), flag it

for the user instead of guessing.

  • Verify the runtime flag flip via pac-log.txt: pac pages upload flips the server-side

Bootstrap 5 flag automatically, but flip outcomes are logged and swallowed by the CLI. Never

trust the upload exit code alone. The authoritative record is the PAC diagnostic log (`pac telemetry

statuspac-log.txt); grep it for BootstrapV5UploadPostProcessor`. The flip **requires an

active portal** — a website record with no provisioned site logs no portal found and skips.

  • Use TaskCreate/TaskUpdate: Create the todo list upfront with all 8 phases before starting work.

Initial request: $ARGUMENTS


Phase 1: Verify Prerequisites

Goal: Ensure PAC CLI is installed, the user is authenticated, the target environment is

confirmed, and the required commands are available.

Actions:

  1. Create the todo list with all 8 phases (see [Progress Tracking](#progress-tracking)).
  2. Run pac help to confirm PAC CLI is installed and on PATH. If missing, point the user to

https://aka.ms/PowerPlatformCLI (dotnet tool install --global Microsoft.PowerApps.CLI.Tool)

and re-verify.

<!-- not-a-gate: data-gathering — free-text environment URL when PAC CLI isn't authenticated; the prompt itself writes nothing -->

  1. Run pac auth who. If not authenticated, ask for the environment URL via AskUserQuestion,

then pac auth create --environment "<URL>" and re-verify. Capture the environment name, URL,

and ID.

<!-- gate: migrate-bootstrap:1.confirm-env | category=consent | cancel-leaves=nothing -->

> 🚦 Gate (consent · migrate-bootstrap:1.confirm-env): Confirm the target environment before any download, migration, or upload. Running the migration against the wrong environment is destructive, so this confirmation is mandatory.

  1. Confirm the target environment with the user (AskUserQuestion: use this environment / choose

another via pac org list + pac org select).

  1. Probe command availability — both verbs are required:
   pac pages help

Confirm bootstrap-migrate and upload appear in the verb list. If either is missing (feature

not enabled in this CLI build / tenant), stop and tell the user the migration can't proceed

until those commands are available.

  1. Locate the PAC diagnostic log — capture the path now; you will need it in Phase 7 to verify

the flag flip:

   pac telemetry status

It prints The diagnostic logs can be found at: <…>\logs\pac-log.txt. This is a **rolling log

across all pac runs and is the authoritative record of the Bootstrap V5 flag flip**. Note:

pac pages upload writes no per-folder logpac-log.txt is the only place its post-processor

records the flip result. Set PAC_LOG = <that path>.

Output: PAC CLI verified, authenticated session, confirmed environment, bootstrap-migrate

and upload confirmed available, PAC_LOG path captured.


Phase 2: Acquire the Site & Back Up

Goal: Get a local copy of the traditional site to migrate, and establish a restore point.

Actions:

2.1 Locate or download the site

  • If the user provided a local site folder path (or $ARGUMENTS names one): verify it exists

and looks like a downloaded traditional site (contains website.yml and sitesetting.yml). Use it

as SITE_FOLDER.

  • Otherwise: list available websites and download the chosen one.
  pac pages list

<!-- gate: migrate-bootstrap:2.1.select-site | category=plan | cancel-leaves=nothing -->

> 🚦 Gate (plan · migrate-bootstrap:2.1.select-site): Choose which website to download when more than one exists. Canceling leaves nothing changed.

Present the websites via AskUserQuestion, then download the selected site:

  pac pages download --path "<SITE_FOLDER>" --webSiteId "<WEBSITE_ID>"

Use the downloaded directory as SITE_FOLDER.

> Confirm this is a traditional site, not a code site. A code-site project has powerpages.config.json

> and a framework package.json; a traditional site has website.yml, sitesetting.yml, and

> *.webtemplate.source.html files. If it's a code site, stop — this skill does not apply.

2.2 Confirm the site is ACTIVATED (not just a website record)

pac pages list shows website records (adx_website). A website record can exist with **no

provisioned/active Power Pages site (portal)** behind it — created by data import/clone, deactivated,

or orphaned. The Phase 7 flag flip (SetPortalBootstrapV5Enabled) targets the portal, not the

website record, so **if no active portal exists the flip silently skips and the live site won't

render** — and you won't find this out until after uploading unless you check now.

Resolve the site URL from websitebinding.yml (adx_sitename) and probe the final status code

(-L follows redirects so a sign-in / canonical-host redirect resolves to its real code):

curl -sL -o /dev/null -w "%{http_code}" "https://<adx_sitename>/"
  • 2xx or a redirect that resolves to 2xx/3xx → active portal; proceed. A private or

protected site legitimately redirects to sign-in or a canonical host, so a resolved 3xx is

active, not a failure.

  • 4xx/5xx → inconclusive from the status alone. A private site can return a non-200 without

being unactivated, so do not conclude "not activated" from the code alone — fetch the error

body (or open the URL in a browser) to look for the unactivated signature:

  curl -sL "https://<adx_sitename>/" | head -c 4000

If the body shows a Dataverse-connection null-ref (Object reference not set … /

CrmOnlineOrganizationService.ToOrganizationService), or the URL fails to render a portal page in

the browser, the site is most likely NOT activated. This is the same condition that makes the

Phase 7 flag flip log no portal found for website <id> via Power Pages API. A 4xx/5xx without

that signature is more likely an auth wall or transient error on an active site — treat as active and

note it for the user rather than blocking.

If the site is confirmed not active, stop and tell the user to activate/provision it first (Power

Pages admin center, or the /power-pages:activate-site skill). Migrating content into an unactivated

website still uploads, but the runtime flag can't flip and the site can't be verified.

2.3 Snapshot the source

Create a restore point before any migration:

cd "<SITE_FOLDER>"
git init -q && git add -A && git commit -q -m "Pre-migration snapshot (Bootstrap 3)"

If the folder is already a git repo, just commit any pending changes so the pre-migration state

is captured.

Output: SITE_FOLDER resolved, confirmed traditional, source snapshot committed.


Phase 3: Pre-Migration Assessment

Goal: Set expectations by inventorying Bootstrap-3 usage and flagging risk areas before

running the engine.

Actions:

  1. Scan the site for Bootstrap-3 markers using Grep over .html, .aspx, .ascx, .css:
  • Component classes: panel, navbar-header, img-responsive, btn-block, pull-left|pull-right,

col-(xs|sm|md|lg)-, glyphicon, label-, page-header, pager, data-toggle|data-dismiss.

  • Count affected files and the rough number of occurrences per category.
  1. Flag risk areas:
  • Heavy custom CSS (large .css files with non-Bootstrap selectors) — won't be auto-converted.
  • Liquid-entangled markup ({% ... %} around classes, conditional dropdowns) — needs review.
  1. Present a concise scope summary and set expectations:

> "This is an assisted migration. The engine will auto-apply the common Bootstrap 3→5 class

> renames. Some changes (grid hierarchy, navbar structure, panel/page-header/pager styling) can

> only be flagged — I'll help apply those in Phase 6. Visual parity isn't guaranteed and you'll

> want to QA the result."

Output: Scope summary presented; user understands this is assisted, not push-button.


Phase 4: Run the Migration Engine

Goal: Produce the migrated <folder>V5 copy.

Actions:

<!-- gate: migrate-bootstrap:4.run-engine | category=consent | cancel-leaves=nothing -->

> 🚦 Gate (consent · migrate-bootstrap:4.run-engine): Explicit consent before running pac pages bootstrap-migrate. The engine writes a new <SITE_FOLDER>V5 copy and never edits the source, so canceling leaves nothing changed.

  1. Get explicit consent to run the engine (AskUserQuestion: "Run the Bootstrap 5 migration on

<SITE_FOLDER>? This creates a new <SITE_FOLDER>V5 copy and does not modify the original.").

  1. Run:
   pac pages bootstrap-migrate --path "<SITE_FOLDER>"
  1. Confirm the engine produced <SITE_FOLDER>V5 containing:
  • Rewritten .html / .js / .aspx / .ascx / *.css files
  • Swapped bootstrap.min.css (Bootstrap 5)
  • Updated sitesetting.yml with a Site/BootstrapV5Enabled record
  • logs.txt and per-file *-diff.json

See [references/migration-engine-reference.md](references/migration-engine-reference.md) for the

full output contract. Set MIGRATED_FOLDER = <SITE_FOLDER>V5.

Output: MIGRATED_FOLDER produced with rewritten files, swapped CSS, logs.txt, and diffs.


Phase 5: Review the Change Report

Goal: Turn logs.txt into a structured, grouped summary that surfaces the manual work.

Actions:

  1. Read <MIGRATED_FOLDER>/logs.txt and categorize per the format documented in the engine

reference. The report opens with three file lists — no change, auto-applied

(Replacement/Addition/Deletion), and hierarchy changes (logged only) — followed by a

per-file detail block (Total Number of Changes:<n> + change lines). Use Grep to count and

locate the work:

  • Grep for Need hierarchy change → the manual hierarchy items (often zero).
  • The most reliable residual signal is the V5 output itself: Grep the migrated *.html

for surviving Bootstrap-3 markers (page-header, glyphicon, label-(info|danger|primary),

panel-(primary|success|info|warning|danger), btn-block, navbar-header). Whatever the

engine left behind is exactly the Phase 6 work.

  1. Present a summary:
  • Counts per category.
  • The list of files with hierarchy changes and CSS-dependent contextual classes (e.g.

panel-primary) — these are the Phase 6 work items.

Output: Grouped change summary; explicit list of residual manual items.


Phase 6: AI-Assisted Residual Fixes

Goal: Apply the structural / CSS fixes the engine flagged but could not safely auto-apply, in

the MIGRATED_FOLDER files.

> Reference recipes: [references/bootstrap-v5-manual-fixes.md](references/bootstrap-v5-manual-fixes.md)

Actions:

  1. Group the residual items by category (grid hierarchy, navbar structure, panel/card styling,

page-header, pager, btn-block, Liquid edge cases, partial paths).

<!-- gate: migrate-bootstrap:6.residual-fixes | category=progress | cancel-leaves=nothing -->

> 🚦 Gate (progress · migrate-bootstrap:6.residual-fixes): Per-category consent before applying each residual fix to the MIGRATED_FOLDER files. Changes are local to the V5 copy and committed per category; canceling leaves nothing outward-facing changed.

  1. For each category, get per-category consent (AskUserQuestion: "Apply the <category> fixes

to <N> file(s)?"). On consent:

  • Apply the recipe from the manual-fixes reference using Edit.
  • Re-check the affected lines against the file's *-diff.json to confirm you didn't disturb

auto-applied changes.

  • Commit per category: git -C "<MIGRATED_FOLDER>" add -A && git -C "<MIGRATED_FOLDER>" commit -m "v5 fixes: <category>"

(init the V5 folder as a repo first if needed). Use -C "<MIGRATED_FOLDER>" on both

add and commit so they run against the V5 copy, not the current working directory.

  1. For ambiguous / Liquid-entangled cases, do not rewrite — list them for the user with the

file and line and a suggested manual change.

Output: Residual fixes applied (or flagged) per category, each committed; ambiguous items listed.


Phase 7: Upload, Auto-Enable Runtime Flag, and Verify

Goal: Upload the migrated site (which automatically flips the server-side Bootstrap 5 flag) and

verify the flag actually took effect.

Actions:

7.1 Pre-flight the manifest

The automatic flag flip is gated on two files in MIGRATED_FOLDER:

  • website.yml must have a valid adx_websiteid.
  • sitesetting.yml must contain Site/BootstrapV5Enabled with value true.

Verify both (Grep/Read). If either is missing, the flag flip silently no-ops — fix before uploading.

7.2 Final consent gate, then upload

<!-- gate: migrate-bootstrap:7.2.upload | category=final | cancel-leaves=nothing -->

> 🚦 Gate (final · migrate-bootstrap:7.2.upload): Final sign-off before the first outward-facing change. pac pages upload publishes the Bootstrap 5 site and auto-enables the runtime flag. Canceling before upload leaves the live site untouched.

This is the first outward-facing change. Get explicit consent (AskUserQuestion: "Upload

<MIGRATED_FOLDER> to environment <ENV_NAME>? This publishes the Bootstrap 5 site and enables the

Bootstrap 5 runtime."). On consent:

pac pages upload --path "<MIGRATED_FOLDER>"

Leave --modelVersion at its default (Standard) for a traditional site. pac pages upload uploads the

content and auto-flips the server-side Bootstrap 5 flag via its post-processor (triggered by the

Site/BootstrapV5Enabled=true setting).

> Use pac pages uploadnot upload-code-site (that is the code-site path and will corrupt a

> traditional site).

7.3 Verify the flag flip (mandatory)

The CLI logs and swallows flag-flip outcomes, so a successful upload does not prove the

runtime is on Bootstrap 5. The authoritative record is pac-log.txt (the PAC_LOG path captured

in Phase 1), not the live site. Check it first — it is decisive in seconds, whereas the live

site can be misleading (an unactivated site throws a 500 that has nothing to do with Bootstrap):

# grep the PAC diagnostic log for the post-processor's result (most recent run is last)
grep -iE "BootstrapV5UploadPostProcessor|SetPortalBootstrapV5Enabled" "<PAC_LOG>"

Three possible outcomes:

| Log line | Meaning | Action |

|----------|---------|--------|

| Set … BootstrapV5Enabled / success (INF) | Flip applied | ✅ Proceed; optionally confirm on the live site. |

| Skipping SetPortalBootstrapV5Enabled: no portal found for website <id> via Power Pages API (WRN) | No active portal — flip never attempted | ❌ The site isn't activated. Activate it (see Phase 2.2 / /power-pages:activate-site), then re-run pac pages upload. |

| ERR/exception from the post-processor | Flip attempted but failed (auth/HTTP) | ❌ Re-confirm 7.1 manifest + permissions, then re-run upload. |

Then corroborate on the live site (only meaningful if the log shows applied): re-render a known

page and confirm the Bootstrap 5 bundle is served, or re-confirm the portal's Bootstrap V5 enabled

state via the Power Pages management surface. If the live URL returns a 5xx with a Dataverse-connection

null-ref (CrmOnlineOrganizationService.ToOrganizationService), that is the "site not activated"

signature — match it against the log's no portal found line rather than treating it as a transient

restart.

Output: Migrated site uploaded; flag-flip outcome read from pac-log.txt (applied / skipped-no-portal

/ errored) and, when applied, confirmed on the live site.


Phase 8: Validate & Summarize

Goal: Confirm the live site works on Bootstrap 5 and record the outcome.

Actions:

  1. Runtime smoke test — invoke /test-site against the site URL to crawl key pages, verify they

render, and capture console/network errors.

  1. Before/after visual check — spot-check the highest-traffic pages (home, navbar, any

panels/cards, forms, pagination) for layout regressions introduced by the migration.

  1. Record skill usage — follow ${PLUGIN_ROOT}/references/skill-tracking-reference.md, passing

--projectRoot "<MIGRATED_FOLDER>" (the folder containing powerpages.config.json) and

--skillName "MigrateBootstrap". Tracking only writes when the project is a code site

(.powerpages-site/site-settings/ exists); for a traditional/native download the script exits

silently as a no-op — that is expected, so call it unconditionally and don't treat the no-op as an

error. If tracking files are written, include them in the final commit.

  1. Summary — present:
  • Files changed per category (auto-applied vs assisted vs flagged-for-manual).
  • Residual items that still need human attention.
  • Confirmation the Bootstrap 5 runtime flag is enabled.
  • Location of the source snapshot (for rollback) and MIGRATED_FOLDER.
  1. Suggest next steps — manual QA pass, /test-site re-runs, and (if promoting across

environments) the ALM skills (/plan-alm).

Output: Site validated on Bootstrap 5, usage recorded, summary + residual list presented.


Important Notes

Throughout All Phases

  • Use TaskCreate/TaskUpdate to track progress at every phase.
  • Ask for user confirmation at the key decision points (below).
  • Present errors clearly — show the relevant command output and explain it before suggesting fixes.
  • No automated rollback after upload — rely on the Phase 2 source snapshot; report failures and

continue/triage rather than auto-reverting.

Key Decision Points (Wait for User)

  1. Phase 1: If not authenticated, get environment URL; confirm/switch target environment.
  2. Phase 2: If multiple sites, which website to download; confirm traditional (not code) site.
  3. Phase 4: Consent to run the migration engine.
  4. Phase 6: Per-category consent before applying residual fixes.
  5. Phase 7: Final consent before uploading (outward-facing).

Progress Tracking

Before starting Phase 1, create a task list with all phases using TaskCreate:

| Task subject | activeForm | Description |

|-------------|------------|-------------|

| Verify prerequisites | Verifying prerequisites | PAC CLI, auth, environment, and command availability (bootstrap-migrate, upload) |

| Acquire site and back up | Acquiring site | Download/locate the traditional site; snapshot the source |

| Pre-migration assessment | Assessing scope | Inventory Bootstrap-3 usage; flag custom CSS / Liquid risk |

| Run migration engine | Running migration | pac pages bootstrap-migrate<folder>V5 |

| Review change report | Reviewing report | Parse logs.txt; group auto-applied vs hierarchy/manual |

| Apply residual fixes | Applying fixes | Per-category assisted fixes for the flagged hierarchy/CSS items |

| Upload and verify flag | Uploading and verifying | pac pages upload; verify the Bootstrap 5 runtime flag flipped |

| Validate and summarize | Validating | /test-site, visual check, record usage, summary |

Mark each task in_progress when starting and completed when done via TaskUpdate.


Begin with Phase 1: Verify Prerequisites

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。

它属于哪个仓库

星标★ 878
本站分层T2
该仓技能数113
原文件路径plugins/power-pages/skills/migrate-bootstrap/SKILL.md

同一个仓库里的其他技能

看这个仓库的全部 113 个技能