跳到主要内容
知仓学习社ZHICANG

spec-writer

Create or refine spec-superflow planning artifacts. Invoke when the change is understood well enough to write proposal.md, specs/, design.md, and ta…

不碰外部(只输出文字)无严重或高危命中hashgraph-online/awesome-codex-plugins

它会碰到什么

扫了多少1 个文本文件,6 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

Spec Writer

Create or refine planning artifacts when the change has moved beyond exploration.

Required Inputs

Read .spec-superflow.yaml (especially dp_0_decisions, dp_0_confirmed) and any existing planning artifacts. If dp_0_confirmed is not true, stop and route back to workflow-start for DP-0.

Config Check

Run: ssf runtime config --get artifacts.order — generate in configured order (default: proposal → specs → design → tasks). Run with artifacts.skip — skip any listed artifacts.

Artifact Roles

  • proposal.md: why and scope
  • specs/: required behavior (testable)
  • design.md: architecture decisions and trade-offs (not line-by-line)
  • tasks.md: dependency-aware implementation steps

Working Rules

Honor DP-0: Read dp_0_decisions, respect confirmed constraints, don't silently expand scope. Pause on unconfirmed decisions.

proposal.md

Must state: observed problem, what changes, in/out scope, impact areas, and proof of completion. Prefer concrete facts over empty adjectives such as “better”, “robust”, or “efficient”.

specs/

Every requirement must be testable. Use SHALL or MUST. Every requirement must have at least one #### Scenario: with WHEN/THEN. Group under ADDED/MODIFIED/REMOVED Requirements headers.

design.md

Must have: relevant facts and constraints, goals and non-goals, decisions (Choice + Rationale + Alternatives + Consequences), and risks with verification evidence. Do not invent stakeholders, migration steps, or open questions when they do not affect the decision.

tasks.md

Must include a delivery/proof map and dependency-aware tasks. Each task names the affected path or bounded area, the observable outcome, and the evidence command. Keep RED/GREEN details, review receipts, and dispatch mechanics in the execution contract/task brief; do not inflate reader-facing tasks into five ritual substeps.

Artifact Generation

When DP-0 has made the scope clear, generate the configured planning pack (proposal, delta specs from templates/spec.md, design, and tasks) in order without pausing between individual artifacts. Validate the pack, then request one DP-2 review. Pause earlier only when the missing decision can change user-visible behavior, compatibility, security, delivery scope, or the selected design; or when artifacts state incompatible scope.

Validation Checklist

proposal.md

  • ## Why > 50 chars, ## What Changes, ## Scope (In/Out), ## Impact, no TBD/TODO; claims name an observed problem and a completion proof

specs/

  • SHALL/MUST for required behavior, #### Scenario: with WHEN/THEN per requirement, grouped under delta headers, no contradictions

design.md

  • facts/constraints, goals/non-goals, ## Decisions (≥1, with Choice+Rationale+Alternatives+Consequences), risks and verification

tasks.md

  • delivery/proof map, numbered tasks, affected paths or bounded areas, observable outcomes, no placeholders, every requirement mapped, explicit dependencies
  • Must use the template checkbox format (one - [ ] per task on its own line); the guard enforces this format when entering execution

If any artifact fails validation, fix before handing off to contract-builder.

DP-2: Artifact Review Gate

Present a concise summary of all 4 artifacts, then ask one DP-2 question for material adjustments. For Full changes, run one independent five-question blind reader check (problem, command boundary, invalidation boundary, continuation boundary, and document flow) before recording approval; repair only answers the reader cannot derive. After approval:

ssf state set <change-dir> dp_2_result "approved: <summary>"
ssf state set <change-dir> dp_2_timestamp now

After the artifacts are done and DP-2 is recorded, advance the state:

ssf state transition <change-dir> specifying

Handoff Rule

Do not start implementation after writing planning artifacts. Once stable, validated, and DP-2 is recorded, hand off to contract-builder.

Exception Handling

  • Parse failures: Report specific file/error; don't generate from corrupted templates
  • Missing templates: Fall back to artifact structure defined in this skill
  • User interruption: Artifacts on disk are the recovery checkpoint; resume from first missing/incomplete one
  • Validation failure: Fix before handoff — do not hand off broken artifacts

Standard User-Facing Handoff

End every user-facing phase report with this concise handoff. Only a successfully

persisted closing state and abandoned are terminal.

Normal report

  • Current stage: <detected workflow stage>.
  • Completed / blocker: <completed work>.
  • Next stage: <next workflow stage or skill>.
  • Entry condition: <what must be true to enter it>.

Blocked report

  • Current stage: <detected workflow stage>.
  • Completed / blocker: <blocking fact or missing evidence>.
  • Next stage: <stage that resumes after the blocker>.
  • Entry condition: <the approval, artifact, validation, or fix required>.

Approval-wait report

  • Current stage: <detected workflow stage>.
  • Completed / blocker: <work ready for the named decision>.
  • Next stage: <stage that follows approval>.
  • Entry condition: <explicit user approval or recorded decision>.

Successful terminal report

  • Current stage: successfully persisted closing or abandoned.
  • Completed / blocker: <persisted terminal outcome>.
  • Next stage: none.
  • Entry condition: no further transition exists.

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。