跳到主要内容
知仓学习社ZHICANG

wsdm-workflow

Use when planning the calendar for a WSDM submission - the single annual cycle from August abstract and paper deadlines through October notification…

不碰外部(只输出文字)无严重或高危命中brycewang-stanford/Awesome-Journal-Skills

它会碰到什么

扫了多少1 个文本文件,7 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

WSDM Workflow

Plan a WSDM campaign around the venue's defining rhythm: one deadline a year,

in August, for a conference the following February - with no rebuttal stage

between them. Missing August costs twelve months, and nothing after August can

improve the outcome. Every date below is a 2026-cycle anchor (abstract

2025-08-07, paper 2025-08-14, notification 2025-10-23, conference 2026-02-22

to 26, Boise); the 2027 edition (20th, Hong Kong, February 15-19, 2027) had

not published verified deadlines at this pack's check date - confirm them at

wsdm-conference.org/2027 before committing the plan.

The annual clock

        T-26w  fit decision (wsdm-topic-selection) + evidence plan
        T-20w  datasets locked, split manifests written, baselines running
        T-12w  main results stable; ablation matrix complete
        T-8w   full draft; adversarial read #1 -> objection inventory
        T-4w   artifact repo review-ready; ethics section drafted
        T-1w   abstract registered (bidding-quality title+abstract)
  Aug   T=0    paper deadline, AoE     <- everything ends here
  Oct   ~T+10w notification            <- no interaction in between
  Nov+         camera-ready + ACM production (dates from acceptance email)
  Feb          single-track conference (talk/poster, registration, travel)

The unusual constraints, made explicit:

  • Front-load quality. Venues with rebuttals let you defend a rushed

evaluation; WSDM does not. The T-8w adversarial read is the highest-leverage

meeting of the campaign - schedule it like a deadline.

  • The August-to-October silence is planning time, not waiting time: prepare

the camera-ready artifact conversion and, in parallel, the rejection fork

(below), so either outcome executes immediately.

  • February logistics are real work: winter travel, visas for the host

country (Hong Kong in 2027), industry disclosure approvals for the final

version - start each at notification, not in January.

The September pressure valve

Since 2026 the series runs a short-paper track with deadlines about a month

after the long-paper deadline (2026 anchor: announced September 11/18, with

registry evidence of an extension to September 18/25 - verify the current

year's dates directly). Plan uses:

  • A long paper that is honestly two results and a wish can be split in July:

the strong, focused result targets the short track; the broader project waits

a year and arrives with more evidence.

  • A near-miss at the long deadline (evaluation incomplete) degrades gracefully

to the short track instead of slipping twelve months.

  • Do not treat "short" as "unfinished": the 2026 call asked for solid,

empirically validated contributions, capped submissions at 10 per author,

and desk-rejected placeholder abstracts.

Alternate entrances to the same room

| Entrance | Typical timing (verify per edition) | What it earns |

|---|---|---|

| Long paper | August deadline | Archival full paper + single-track talk |

| Short paper | ~September deadline (since 2026) | Archival concise paper |

| Demonstration | Autumn deadline; 4-page cap in 2026 | Archival demo paper + demo floor |

| WSDM Cup | Task-specific autumn schedule | Challenge standing + workshop-style exposure |

| Doctoral consortium | Autumn deadline | Mentoring + community entry for PhD students |

| Industry Day talk | CFP per edition (2026 theme: LLMs and agentic AI in industry) | Non-archival visibility with the practitioner half of the venue |

A lab shipping a system can rationally take two entrances in one year (e.g.,

short paper + demo) - check the current calls' dual-submission language first.

Coordinating with the sibling calendar

WSDM's August deadline sits inside a lattice of neighbors (all timings

approximate and cycle-volatile - verify each): SIGIR around January/February,

TheWebConf around October, CIKM around May, RecSys in spring, KDD's two cycles

around August and February. Two standard plays:

  • Forward chain: a paper rejected from SIGIR (decisions in spring) has a

natural summer revision window before WSDM's August deadline - the reviews

arrive in time to act on them.

  • Backward chain: a WSDM rejection in October reaches SIGIR or KDD Cycle 2

in winter with fixes applied. Map the chain before submitting, so the

October decision triggers execution instead of deliberation.

Never dual-submit along the chain: these are archival venues with standard

concurrent-submission prohibitions; the chain is sequential by definition.

Contingencies

  • Deadline extension announced: treat extra days as validation time, not

new-experiment time; late-added results are the least-reviewed and

most-attacked parts of a paper at a no-rebuttal venue.

  • A competing preprint appears in July: do not race it with rushed

experiments. Add the contrast citation, sharpen the delta sentence, and let

the August version be correct rather than first-and-fragile.

  • Key experiment breaks at T-2w: invoke the valve - descope the claim to

what stands, or pivot to the short track - rather than shipping a table you

cannot defend to reviewers you cannot answer.

  • Chair announcement contradicts the CFP: newest official instruction

wins; log both with dates (precedence order in

../../resources/external_tools.md).

Team operating rules

  1. One owner for the EasyChair record: account, abstract text, author order,

conflicts, final PDF upload.

  1. The objection inventory (started at T-8w) is a living document with named

owners per objection; unresolved rows at T-1w force claim reductions.

  1. The artifact repo freezes at T-1w except README fixes - late code churn

breaks the numbers-match-paper invariant more often than it helps.

  1. Log every date-fact with its source URL the day you verify it; August

deadline drift (extensions happen) is checked weekly in the final month

against the official site, not social media.

Output format

[Cycle] target edition + verified deadlines (source + check date)
[Milestones] T-26w..T-0 with owners; current slack per milestone
[Valve decision] long / long+short split / short / defer, with reason
[Alternate entrances] pursued this year: <list or none>
[Chain map] pre-WSDM source venue / post-WSDM destination, with dates
[Logistics] visa / registration / disclosure lead items and start dates

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。