USENIX Security Workflow

USENIX Security runs two independent submission cycles per year, so "when do we

submit?" is a real strategic choice, not a fixed date. This skill turns a target

cycle into a dated backward plan and assigns owners to the venue-specific risks.

Dates below are the '26/'27 cycle values read on 2026-07-08 (via search renderings;

usenix.org direct fetch 403'd) — reconfirm against the live CFP.

Step 1: pick the cycle

| Consideration | Favors the earlier cycle | Favors the later cycle |

|---|---|---|

| Readiness | Evaluation truly done now | Needs one more experiment done right |

| Conference lead time | Cycle-1 accepts publish ~7 months pre-symposium | Cycle-2 accepts closer to the event |

| Competing deadlines | Avoids clashing with a CCS/S&P/NDSS date | Room to route a reject to the next venue |

| Resubmission runway | Reject still leaves the same-year second cycle open* | Reject pushes to next year |

\*Subject to the cycle's resubmission-restriction text — the '26 CFP delegated

Cycle-2 reject restrictions to the '27 chairs, so verify before assuming a reject

can re-enter (see usenixsec-review-process).

Reference calendar (verify per cycle):

| Milestone | Sec '26 C1 | Sec '26 C2 | Sec '27 C1 | Sec '27 C2 |

|---|---|---|---|---|

| Registration | Aug 19 '25 | Jan 29 '26 | Aug 18 '26 | Jan 19 '27 |

| Submission | Aug 26 '25 | Feb 5 '26 | Aug 25 '26 | Jan 26 '27 |

| Early reject | Oct 7 '25 | Mar 17 '26 | 待核实 | 待核实 |

| Notification | Dec 4 '25 | May 14 '26 | 待核实 | 待核实 |

| Finals | Jan 15 '26 | Jun 11 '26 | 待核实 | 待核实 |

| Symposium | Aug 12–14 '26 (Baltimore) | Aug 11–13 '27 (Denver) | | |

Step 2: backward-plan from the registration date

Registration, not submission, is the first hard wall (it freezes title, abstract,

authors, conflicts a week early). Plan backward from it:

T-12 wk  Topic/venue fit locked (usenixsec-topic-selection); threat model drafted
T-10 wk  Core experiments running; artifact repo scaffolded from day one
T-8  wk  Related-work sweep of all Big-Four cycles closed since last pass
T-6  wk  Adaptive-attacker / base-rate experiments (the ones that get demanded)
T-4  wk  Full draft; Ethical Considerations + Open Science appendices written
T-3  wk  Internal review + cold-reader pass on intro/threat model
T-2  wk  Anonymization sweep; artifact anonymous mirror live and tested
T-1  wk  REGISTRATION: freeze metadata; final polish only after this
T-0      Submit; re-download from HotCRP and read cold

The two moves teams most often leave too late: the adaptive-attacker experiment

(defenses) and the ethics/disclosure timeline (live-system work). Both must

start weeks before the deadline — a disclosure clock especially cannot be

compressed, since vendors set the pace.

Step 3: assign the venue-specific risks

| Risk | Owner | Early mitigation |

|---|---|---|

| Ethics/disclosure not started | PI | Open the disclosure and IRB threads at project start |

| Artifact not reproducible | Eng lead | Build the repo alongside the code, not after the paper |

| Threat model drifts from eval | First author | Adversary-consistency review at T-3 wk |

| Anonymity leak in artifact | Eng lead | Anonymous mirror built and log-out-tested by T-2 wk |

| Missed a fresh Big-Four paper | Reader | Dated literature sweep at T-8, re-sweep at T-2 |

Step 4: run the post-submission and post-decision phases

  • Waiting: expect the early-reject gate first (a survivable-but-quiet signal),

then full notification. Do not start the next paper assuming acceptance, but do

keep the artifact repo warm — acceptance starts the Phase-1 clock immediately.

  • Shepherd approval: scope the change list within 48 hours; it fits a two-week

window and no more (see usenixsec-author-response).

  • Accept: run camera-ready and Phase-1 artifact availability in parallel — they

share a deadline (see usenixsec-camera-ready).

  • Reject: mine the reviews, check the resubmission restriction, decide between

the next USENIX cycle and a sibling venue with an open deadline.

Coordinating across the Big-Four calendar

Because USENIX Security, CCS, S&P, and NDSS each run multiple deadlines, a lab can

keep a paper in motion nearly year-round — but a paper may sit under review at only

one archival venue at a time. Maintain a shared deadline board and a one-in-one-out

rule per paper; the dual-submission bar is real and enforced.

Reverify each cycle

  • All dates in the table above ('27 review/notification/finals are 待核实).
  • Symposium location and dates for your target year.
  • Resubmission restrictions gating cycle-to-cycle and year-to-year moves.

Output format

[Cycle chosen] which cycle + why (readiness / lead time / clash / runway)
[Backward plan] dated milestones from registration wall
[Risk owners] the five venue risks assigned + early mitigations underway
[Post-decision] branch plan for accept / shepherd / reject