UAI Workflow

Use this as the project-management layer over the other UAI skills. UAI is a conference

run by the AUAI: there is no editor-in-chief and no rolling submission — one deadline

per year, per-edition chairs, and PMLR publication funded by registration rather than

author fees. The 2026 calendar below is the verified anchor (checked 2026-07-08);

substitute the current year's official dates before planning anything.

The 2026 shape of a UAI year

| Phase | 2026 anchor | Owner-side work |

|---|---|---|

| Fit decision | months before | Confirm uncertainty is the contribution (uai-topic-selection) |

| Submission opens | Jan 25 | OpenReview profiles, conflicts, subject areas ready |

| Paper deadline | Feb 25, 23:59 AoE | Single PDF (8pp main + appendix), ≤15 MB, ZIP ≤50 MB |

| Bidding | Mar 2–9 | Nothing — routing was set by your abstract |

| Reviews written | Mar 21 – Apr 11 | Prepare response infrastructure; draft anticipated objections |

| Author response | Apr 23 – May 2 | Evidence-anchored replies (uai-author-response) |

| Reviewer–AC discussion | May 2–8 | Silence; the response argues for you |

| Notification | Jun 1 | Triage outcome; celebrate or re-route |

| Camera-ready | Jul 27 | PMLR files, public artifacts (uai-camera-ready) |

| Conference | Aug 17–21, Amsterdam | Tutorials Mon, main Tue–Thu, workshops Fri |

Backward plan from the paper deadline

Offsets assume a probabilistic-methods paper with theory and experiments; shift for

your mix, and re-anchor to current official dates:

  • T−10 weeks: contribution sentence frozen; identifiability/guarantee target named;

ladder of experiments designed (exact-truth, stress, real).

  • T−8: core theorem believed and sketched; assumption set labeled A1…An and no

longer moving.

  • T−6: exact-truth experiments done; the theorem's prediction visibly matches or

the paper's story changes now, not at T−1.

  • T−4: full draft in the UAI template; appendix skeleton mirrors main-text

numbering; baselines tuned and logged.

  • T−3: internal mock review against the four criteria (correctness, novelty,

backing, clarity) by someone outside the project.

  • T−2: stress and real-data experiments locked; determinism ledger and manifests in

the artifact; supplementary ZIP assembled from a clean export.

  • T−1: anonymity sweep of PDF and ZIP; page/size caps verified mechanically;

OpenReview form fields drafted.

  • T−0: upload early in the day AoE-wise; re-download and cold-read.

Role assignments that prevent the classic failures

# uai-cycle-owners.yaml — one name per row, no shared ownership
anonymity_sweep:      # PDF + ZIP + metadata; leaks are unfixable after the deadline
evidence_map:         # every claim -> exhibit; updated when any result changes
appendix_integrity:   # body statements == appendix statements after every edit
artifact_build:       # clean-export ZIP, manifest files, size cap
openreview_form:      # profiles, conflicts, subject areas, abstract == PDF abstract
response_marshal:     # archives submitted PDF; drafts objection bank before reviews
camera_ready:         # PMLR forms, de-anonymization, public repo tag
presentation:         # poster, spotlight, registration, travel/visa timeline

The two most damaging single points of failure at UAI specifically: an unowned

anonymity sweep (appendices inside the reviewed PDF widen the leak surface), and an

unowned appendix-integrity check (deadline-week edits to body theorems silently orphan

their proofs).

Between decision and conference

  • Accepted: the June-to-July window carries camera-ready, artifact publication, and

registration simultaneously — assign them to different people on day one.

  • Rejected: run the axis triage from uai-review-process within a week while context

is fresh; the natural re-route targets (AISTATS, NeurIPS/ICML, CLeaR, or a journal)

have their own calendars, and reviews in hand are an asset that depreciates.

  • Either way: at least one author may be called to review for UAI — the volunteer

agreement signed at submission — so protect reviewing bandwidth in March–April.

The cycle archive

One deadline per year means institutional memory is the compounding asset. At each

transition, file into a shared, dated directory:

  • The exact uploaded PDF and ZIP (deadline day) — responses must quote these.
  • The OpenReview form contents as submitted (screenshot or export).
  • All reviews, your responses, and the meta-review (decision day).
  • The camera-ready as published, plus the PMLR entry once the volume is live.
  • A one-page retrospective: which criterion drew fire, which anticipated objection

materialized, what the next cycle should do differently.

Groups that skip the retrospective re-learn the same reviewer objection annually.

Contingency table

| If this happens | Then | Because |

|---|---|---|

| Theorem breaks at T−3 | Demote it to a conjecture + empirical study, or pull the paper | A wrong proof fails correctness; a scoped claim can still pass backing |

| Key experiment unfinished at T−1 | Cut the claim, not the caveats | Claims without exhibits fail the backing criterion |

| Coauthor conflict list incomplete at deadline | Fix profiles before the form, even if tight | Conflict errors poison assignment invisibly |

| Reviews arrive harsher than expected | Run axis triage before drafting anything | Emotion-first responses waste the short window |

| Accepted but presenter cannot travel | Check the current remote-presentation rules immediately | 2026 said "physically or remotely", but details were 待核实 |

| Rejected with fixable-axis reviews | Target the next honest-fit deadline within the month | Review memory and momentum decay fast |

First-cycle notes

For a group's first UAI attempt: budget one extra week for OpenReview profile setup

and conflict entry across all authors; expect the two-column template to shrink an

apparently-fitting draft by half a page; and have the mock reviewer score the four

posted criteria explicitly — first-time submissions most often lose on backing, not

on correctness.

Standing warnings

  • Never inherit dates from this file or from memory; the official important-dates page

is the only calendar.

  • Registration fees, in-person requirements, and remote-presentation options were not

fully verifiable for 2026 at pack-check time (待核实) — confirm before booking travel

or promising remote attendance.

  • One-deadline venues punish schedule slips brutally: a week late here is a year late.

Output format

[Cycle position] fit / build / submitted / response / decided / camera-ready / conference
[Next hard date] <official date + source URL>
[Critical path] <three tasks gating the next transition>
[Owner gaps] <rows in the owner map without a name>
[Re-route plan] <standing answer to "if rejected, then where">