SOSP Workflow

Use this to place a project on the SOSP calendar and to decide what to do in the

current phase. SOSP has been annual since 2024 (the SIGOPS announcement is at

sigops.org/2023/sosp-is-going-annual/), which changed campaign planning from a

two-year bet into a rolling circuit. All dates below were checked 2026-07-08.

The 2026 cycle as the template

| Milestone (2026 cycle) | Date | Phase it opens |

|---|---|---|

| Abstract registration | March 27, 2026 (Apr 1 AoE window rendered in EDT on HotCRP) | Freeze title/authors/conflicts |

| Full paper deadline | April 2, 2026, 7:59:59 AM EDT | Review |

| Author response window | Announced with reviews, pre-PC-meeting | sosp-author-response |

| Notification | July 3, 2026 | Camera-ready + AE (accepted) or retarget (rejected) |

| Camera-ready | August 28, 2026 | Shepherded final version |

| Conference | Sep 29 - Oct 2, 2026, Prague, Czech Republic | Talk, posters, workshops |

As of 2026-07-08 the notification has just landed: teams are either five days

into the acceptance track or five days into retargeting. SOSP 2027 dates are

unpublished (待核实 at sigops.org and sosp.org); the annual pattern implies a

spring 2027 deadline, but never back-schedule against an implied date — only

against a posted one.

Accepted: three threads, two months

July 3 to August 28 runs three deadline-bound conversations in parallel, and the

standing failure is one person owning all three:

  1. Shepherd thread — revision plan within days, agreed scope, 13th/14th page

negotiation (see sosp-camera-ready). Owner A.

  1. Artifact thread — sysartifacts registration opens days after notification;

the evaluation window is interactive (see sosp-artifact-evaluation). Owner B.

  1. Logistics thread — ACM rights form, registration, Czech-entry visas where

needed, talk preparation. Owner C, earliest start wins on visas.

Rejected: the retargeting circuit

Annual SOSP plus annual OSDI plus the EuroSys/ATC/NSDI ring means a systems paper

is rarely more than a few months from its next natural deadline. Retarget on a

decision tree, not on grief:

  • Reviews attack soundness (evaluation holes, unisolated mechanisms): fix the

evidence first; the next deadline is whichever one the new experiments make.

  • Reviews attack fit or significance but concede soundness: the paper may be

right for a sibling with a different center of gravity — networked-systems

framing to NSDI, storage framing to FAST, deployment/practitioner framing to ATC.

  • Reviews are strong with one blocker: an OSDI resubmission in the next window

with a surgical fix and a cover-your-delta introduction paragraph is the highest

expected-value move. Exact sibling deadlines shift every cycle (待核实 against

each venue's current CFP before promising a date to co-authors).

Back-scheduling the next submission

T-9 months   problem locked; motivating measurement exists; skeleton design review
T-6 months   system runs end-to-end on one workload; claim list drafted
T-4 months   evaluation matrix frozen (sosp-experiments); baselines built and tuned
T-10 weeks   full experimental sweep begins; env capture automated (sosp-reproducibility)
T-6 weeks    complete draft; strict 15-minute read by an outside systems reader
T-3 weeks    evaluation freeze; figures one-command from logs
T-10 days    format compile, leak sweep, conflict list drafted (sosp-submission)
T-6 days     abstract registration
T-0          upload; verify the HotCRP-held PDF, not the local one

The two intervals teams misjudge: baselines (building and fairly tuning someone

else's system routinely costs a month) and the draft-to-freeze gap (a SOSP draft

that first exists three weeks before the deadline reads like it).

Cadence discipline for a group

  • Track the circuit in one shared calendar: SOSP, OSDI, EuroSys, ATC, NSDI, FAST,

plus HotOS in odd rhythm for early-stage ideas — each with abstract and paper

gates, refreshed from official CFPs each fall and spring.

  • One project, one primary venue bet, one named fallback — deciding the fallback

before notification removes the week of post-rejection drift.

  • Never submit the same work to overlapping review cycles; systems venues share PC

members and treat dual submission as an integrity violation.

Output format

[Phase] where this project sits on the cycle today
[Owners] shepherd / artifact / logistics threads assigned?
[If rejected] soundness vs fit diagnosis -> named next venue + posted deadline
[Back-schedule] T-milestones with dates against the next posted deadline
[Calendar risk] the interval currently underestimated