跳到主要内容
知仓学习社ZHICANG

sigmetrics-workflow

Use when planning an ACM SIGMETRICS project timeline across the three rolling deadlines (summer/fall/winter), from venue fit through abstract regist…

不碰外部(只输出文字)无严重或高危命中brycewang-stanford/Awesome-Journal-Skills

它会碰到什么

扫了多少1 个文本文件,6 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

SIGMETRICS Workflow

Use this as the project-management skill for a SIGMETRICS submission. SIGMETRICS runs **three

rolling deadlines a year (summer / fall / winter) into the POMACS** journal, so the calendar is

a choice among deadlines, not a single annual scramble. Replace every date with the current

official timetable and work backwards from the abstract-registration cutoff, which precedes each

paper deadline by about a week.

SIGMETRICS has rotating per-edition General and Program Chairs (appointed by the SIGMETRICS

executive committee) rather than a standing conference editor-in-chief; POMACS is open access

with no APC, and at least one author presents each accepted paper. Re-check the current

organizing-committee page rather than carrying a name forward.

The rolling-deadline advantage

Unlike a once-a-year venue, SIGMETRICS lets you aim at the next deadline that fits your

evidence. Two consequences:

  • Missing a deadline costs ~4 months, not a year — the next rolling deadline is a quarter away.

Do not rush a proof or a measurement campaign to hit summer if fall gives you a clean result.

  • Publication timing matters: summer/fall acceptances appear in POMACS before the

conference; a winter acceptance publishes in the following issue. Choose the deadline whose

POMACS timing and presentation slot fit your goals.

Milestones

  • Venue fit: confirm SIGMETRICS over IMC/SIGCOMM/NSDI/a theory venue, and the correct track

(sigmetrics-topic-selection).

  • Evidence lock: freeze the model and assumptions, complete the proofs, and finish the

simulation/measurement that validates them.

  • Abstract registration: submit real title, abstract, authors, conflicts, and track by the

earlier registration deadline.

  • Submission: upload the anonymized acmsmall PDF and the artifact reference by the paper

deadline (23:59 AoE).

  • Reviews: triage each comment by criterion (rigor, proof correctness, assumption validity,

evidence, novelty, reproducibility).

  • One-Shot Revision (if issued): close the entire required-changes list and resubmit to one of

the two subsequent deadlines — a single shot, re-read by the original reviewers.

  • Accept + shepherding: incorporate the shepherd's required changes into the final POMACS

version.

  • Publication + presentation: POMACS camera-ready, artifact/badges if the cycle offers them,

register, and present.

Backward plan from a paper deadline

| Weeks out (heuristic) | Performance-evaluation milestone |

|---|---|

| 10+ | Model and assumptions fixed; main theorems stated; measurement/trace secured |

| 8 | Proofs complete and internally checked; simulator built with logged seeds |

| 6 | Analysis-vs-simulation agreement established; baselines chosen and tuned |

| 4 | Full draft in acmsmall; artifact (model, simulator, trace scripts) assembled and anonymized |

| 3 | Internal mock review by a performance-evaluation reader (check a proof case and an assumption) |

| 2 | Assumption-validity section hardened; related-work delta sharpened; 20-page budget met |

| 1 | Anonymity sweep on PDF and artifact; abstract registered |

| 0 | Paper + artifact reference on the correct per-deadline HotCRP site |

These offsets are planning heuristics only — anchor every one to the current call and the

per-deadline HotCRP deadlines page, never to a previous cycle.

The 12-month bar and cycle-hopping

  • A reject cannot be resubmitted to any SIGMETRICS deadline for 12 months from the initial

submission — a structural reject costs a full year at SIGMETRICS, so route a fundamentally

reframed paper elsewhere meanwhile rather than idling.

  • A One-Shot Revision is not a reject: it resubmits to a subsequent deadline within the rolling

process. Budget the revision window to close the whole list in one shot.

Failure modes by stage

  • A proof still has an open case at week 4 forces a rushed appendix nobody has checked — the

classic rigor reject in the making.

  • An unvalidated assumption (claiming M/G/1 without fitting the workload) invites the "does the

model match reality?" objection that a One-Shot Revision then has to repair.

  • Leaving the simulator/trace scripts to the final week is how a cluster path or a

provenance string leaks identity under double-anonymity.

  • Rushing a One-Shot Revision into the nearer deadline and leaving a listed item half-done turns

a winnable single-shot into a reject.

Coordination notes

  • Assign one owner for the proofs/appendix and another for the simulator/measurement and the

anonymity sweep; shared ownership is how both slip.

  • Archive the exact submitted PDF, artifact, and (later) the required-changes list and response —

the single-shot revision must close that list precisely.

Output format

[Current stage] idea / model+proof / evidence / registration / submitted / one-shot revision / accepted
[Chosen deadline] summer / fall / winter <cycle>, and its abstract + paper dates (source)
[Critical path] <three tasks that determine readiness>
[Risk register] <proof completeness / assumption validity / anonymity / reproducibility / page budget>
[Owner map] <task -> person or role>

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。