跳到主要内容
知仓学习社ZHICANG

siggraph-workflow

Use to plan a SIGGRAPH or SIGGRAPH Asia Technical Papers campaign backward from the deadline, covering the two annual cycles, the form-then-upload t…

不碰外部(只输出文字)无严重或高危命中brycewang-stanford/Awesome-Journal-Skills

它会碰到什么

扫了多少1 个文本文件,4 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

SIGGRAPH Workflow

SIGGRAPH runs on two cycles a year and a compressed single-round calendar with a journal-grade

tail. Planning backward from the right deadline — and knowing which of the two conferences you are

targeting — is the highest-leverage move. Dates below are the SIGGRAPH 2026 / SIGGRAPH Asia 2026

snapshots from resources/official-source-map.md; reopen the live Important Dates page for your

cycle first.

The two cycles

| Cycle | Deadline (approx.) | Conference | 2026 instance |

|---|---|---|---|

| SIGGRAPH (North America) | ~January | Summer | SIGGRAPH 2026, Los Angeles, 19-23 Jul 2026; form 15 Jan, upload 23 Jan 2026 (22:00 UTC) |

| SIGGRAPH Asia | ~May | December | SIGGRAPH Asia 2026, Kuala Lumpur, 1-4 Dec 2026; Stage-2 paper 12 May, upload 13 May 2026 |

| TOG direct | rolling | (no conference talk) | ScholarOne, outside the conference cycle — less common |

A rejected paper is typically revised against the reviews and resubmitted to the next cycle, so

the two deadlines form a natural half-year rhythm. Pick the cycle whose deadline your results can

credibly meet — a rushed submission to the nearer deadline usually loses to a finished one at the

next.

Backward plan from the upload deadline

T-0     Complete submission: PDF (or MD5) + supplemental video + representative image on Linklings
T-1wk   Submission form locks title/abstract/topics/ALL co-authors (earlier hard deadline)
T-2wk   Freeze results; render the final results video; clear rights on every frame/figure
T-4wk   Final comparisons + timings on stated hardware; ablations complete
T-8wk   Draft complete in acmart (>=2.16); teaser figure locked; internal reviews
T-12wk+ Method + implementation stable; baselines reproduced; scene set assembled

The two immovable graphics-specific costs are the results video (allow real production time)

and faithful baseline comparisons (allow time to build and run others' code). Neither

compresses well in the last week.

After submission

Reviews released -> you see the full set
Rebuttal window (~6 weeks post-deadline): <=1000 words, text only, address factual errors
Technical Papers Committee meeting: conditional accept / reject + track (Journal vs Conference)
[If conditional] make every required change -> second-stage committee verification
Camera-ready: TOG metadata, rights/DOI, final video, permanent code archive
Presentation: at least one author presents in person at the conference

Milestone checklist

  • [ ] Cycle chosen (SIGGRAPH vs SIGGRAPH Asia) and its exact UTC cutoffs confirmed on the live page.
  • [ ] Track intent chosen (dual-track vs Journal-only) — see siggraph-submission.
  • [ ] Baselines reproduced and running before the writing freeze.
  • [ ] Results video scoped and scheduled as a real production task.
  • [ ] Submission form completed (authors locked) before its earlier deadline.
  • [ ] Rebuttal plan ready the moment reviews land — see siggraph-author-response.
  • [ ] Conditional-accept change list tracked to the second-stage review.
  • [ ] Camera-ready TOG apparatus and permanent archive prepared — see siggraph-camera-ready.
  • [ ] Presenter and travel confirmed for in-person presentation.

Reverify each cycle

  • Both conferences' exact dates and UTC cutoffs, and whether the year runs the usual two editions.
  • The rebuttal window and length, the acmart revision, and the Conference-track page budget.
  • Whether review is single-blind or anonymized this cycle (待核实 for 2026 wording).

Output format

[Target cycle] SIGGRAPH 20XX (Jan) / SIGGRAPH Asia 20XX (May) / TOG-direct
[Countdown] weeks to form deadline / upload deadline
[Critical path] video production + baseline comparisons on track? yes/no
[Post-submission] rebuttal plan / conditional-accept list / camera-ready readiness
[Blockers] <ordered, dated to the UTC cutoff>

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。