PLDI Workflow

PLDI is an annual, single-deadline venue with a long tail: the paper is due in

November, but the project is not finished until the PACMPL article, the badged

Zenodo artifact, and the June talk have all shipped. Plan all three from the

start. Anchor dates below are the 2026 cycle (deadline Nov 13, 2025; response

Feb 17-21, 2026; notification Mar 5, 2026; registration opened Mar 16;

conference in Boulder Jun 15-19, 2026) — reread the current dates page before

scheduling anything, and note that PLDI 2027's calendar was unpublished as of

2026-07-08 (待核实).

PLDI has no standing editor-in-chief and charges no submission fee; leadership

rotates per edition (2026: General Chair Bor-Yuh Evan Chang, Program Chair Manu

Sridharan), the conference is funded through registration, and the PACMPL

open-access cost is handled through SIGPLAN/ACM Open arrangements at

camera-ready time (pldi-camera-ready), not at submission.

Backward plan from the November deadline

| Weeks out | Milestone for a compiler/analysis paper |

|---|---|

| 12+ | Mechanism frozen; running example chosen; suite + baselines locked (pldi-experiments) |

| 8 | Implementation feature-complete on the suite; measurement protocol scripted (pldi-reproducibility) |

| 6 | Full benchmark campaign run once end-to-end; losing benchmarks diagnosed |

| 4 | Complete draft in acmsmall; proofs or soundness argument internally reviewed |

| 3 | Mock review by a PL colleague outside the project; ablation gaps closed |

| 2 | Final measurement run from clean scripts; claim ledger reconciled (pldi-writing-style) |

| 1 | Anonymity sweep, supplement assembly, HotCRP fields, dual-submission check |

| 0 | Upload with a day of slack |

The long tail after the deadline

Nov: submit; archive exact PDF + scripts + raw results
Dec-Jan: keep the artifact warm — the response window may need a rerun
Feb: response window (days, not weeks): triage -> draft -> co-author pass -> submit
Mar: decision. Accept: start AE packaging same week; camera-ready plan.
     Reject: file reviews against the claim ledger; decide POPL/OOPSLA/next PLDI.
Apr-May: artifact evaluation runs; PACMPL production; register; build the talk.
Jun: conference. Post-talk: sync the Zenodo record with the final article.

Two scheduling traps dominate. First, the response window is short and fixed —

a co-author on vacation in late February is a real project risk; put the window

on calendars in November. Second, artifact evaluation begins right after

notification, so the team that celebrates acceptance for two weeks starts AE

already behind (pldi-artifact-evaluation).

Ownership map

Assign one named owner each for: the measurement protocol, the anonymity sweep,

the response draft, the artifact, and the camera-ready/rights workflow. The

artifact owner should not be the graduating student whose defense is in April.

Rejection routing

A PLDI reject in March leaves useful runway: OOPSLA and ICFP deadlines, or the

next PLDI in November. Route by what the reviews attacked — soundness objections

must be fixed before any resubmission inside the same reviewer community

(pldi-review-process, pldi-topic-selection).

Output format

[Stage] design / implementation / evaluation / writing / submitted / response / decided / post-acceptance
[Next hard date] <from the live dates page; 待核实 if unpublished>
[Critical path] <three tasks gating the next stage>
[Owners] protocol / anonymity / response / artifact / camera-ready
[Long-tail risks] response-window availability, AE start, registration, talk