跳到主要内容
知仓学习社ZHICANG

oopsla-workflow

Use when planning an OOPSLA campaign on the two-round clock — choosing October vs March entry, budgeting for Minor or Major Revision paths, mapping …

不碰外部(只输出文字)无严重或高危命中brycewang-stanford/Awesome-Journal-Skills

它会碰到什么

扫了多少1 个文本文件,4 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

OOPSLA Workflow

OOPSLA gives a paper two doors per year into the same PACMPL volume — for

2026, October 10, 2025 (Round 1 → Issue OOPSLA1, published from April 1,

  1. and March 17, 2026 (Round 2 → Issue OOPSLA2, from October 1, 2026),

with all outcomes presented at SPLASH (Oakland, October 4–9, 2026; OOPSLA

talks October 5–7). Planning an OOPSLA campaign is therefore a routing

problem over rounds and revision outcomes, not a countdown to a single

deadline. As of 2026-07-08 the next open door is the 2027 volume's Round 1,

CFP not yet posted (待核实) — re-anchor every date below to live pages.

Door choice: October vs March

| Factor | Favors the October round | Favors the March round |

| --- | --- | --- |

| Revision insurance | Major Revision lands in March, same volume | Major Revision waits ~7 months for next volume's R1 |

| Publication timing | April issue; citable before the conference | October issue; publishes near conference time |

| Evidence maturity | Requires the evaluation done by early fall | Buys a winter of experiments |

| Team calendar | Summer build, fall write | Fall build, winter write |

| Talk lead time | Long runway to SPLASH | Acceptance close to travel booking |

Default heuristic: enter the earliest round where the evidence (not the

prose) is complete — the revision insurance of the early round compounds,

because the most likely non-accept outcome for solid work is a revision, and

same-volume revision is the cheapest one available anywhere in the SIGPLAN

family.

Campaign state machine

PLAN ──> ROUND N SUBMITTED ──> RESPONSE WINDOW ──> outcome?
  Accept ─────────────► CAMERA-READY ► ARTIFACT ► ISSUE ► SPLASH TALK
  Minor Revision ─────► execute list, same round ► (as Accept)
  Major Revision ─────► revise against expectations ► ROUND N+1 (same
                        reviewers where possible)
  Reject ─────────────► diagnose ► re-route (oopsla-topic-selection)
                        or rebuild ► a later round
Each transition has an owner and a date pulled from the live track page.

Backward plan from a target round (T = deadline)

  • T-12 to T-8 weeks — freeze claim list; run oopsla-experiments

routing; start the demand matrix and reproducibility ledger.

  • T-8 to T-4 — full draft in the 23-page frame; related-work family

sweep (oopsla-related-work); internal red-team read using the four

SIGPLAN pillars.

  • T-4 to T-1 — style pass (oopsla-writing-style); appendix layering

(oopsla-supplementary); Data-Availability Statement drafted from the

ledger.

  • Final 72 hours — the filing-day sequence in oopsla-submission.
  • Post-submission — pre-write response scaffolding: the concerns you

already know about, with PDF pointers ready for the four-day window.

Revision-path budgeting

Reserve capacity after submission: the two most probable outcomes for

competent work — Minor and Major Revision — both demand engineering time on

a fixed clock. A team that disbands to other projects the week after the

deadline systematically converts Minor Revisions into missed opportunities.

Rule of thumb: hold 20% of the build team's time in reserve until the

outcome letter, then re-plan against the actual expectation list.

Post-acceptance rail

Camera-ready reconciliation (oopsla-camera-ready) → artifact kick-the-tires

and badges (oopsla-artifact-evaluation) → Zenodo DOI into the final

statement → issue publication → SPLASH registration, talk, and optional

poster. The talk lands months after OOPSLA1 publication — plan it as a

presentation of known work, and budget travel to the SPLASH city early.

Output format

[Cycle anchor] current volume + next open round (live URL + date checked)
[Door choice] round + rationale from the table
[State] position in the state machine
[Reserve] revision capacity held + expiry
[Next transition] owner, date, blocking items

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。