MICRO Review Process

Model of the pipeline a MICRO submission enters, anchored to the 2026 (59th) cycle

as verified 2026-07-08. Committee composition and internal mechanics vary by year

and are only partly public — items marked 待核实 must be reconfirmed on

microarch.org/micro59/ before being repeated as fact.

2026 cycle timeline (verified)

| Gate | Date | Notes |

|---|---|---|

| Abstract registration | March 31, 2026, 11:59 PM EDT | Hard gate for paper upload |

| Full paper | April 7, 2026, 11:59 PM EDT | HotCRP: micro2026.hotcrp.com |

| Rebuttal / revision window | June 3–17, 2026 | Two weeks — unusually long |

| Notification | July 7, 2026 | |

| Camera-ready | September 11, 2026 | |

| Symposium | Oct 31 – Nov 4, 2026, Athens | |

The eight-week gap between upload and rebuttal is when reviews are written; the

three weeks after the window close is discussion and the decision meeting.

What the process is known to enforce

  • Double-blind, end to end. Anonymity obligations persist through the

rebuttal/revision window; artifact links stay anonymized the whole time.

  • Format policing with teeth. Submissions are inspected visually and

automatically; violations can reject a paper even after the HotCRP checker

passed it (see micro-submission).

  • A professional-conduct clause covering both directions. The 2026 guidelines

state that abusive or inappropriate language in reviews, comments, or rebuttals

can be grounds for dismissing reviewers, rejecting papers, and reporting to ACM

and IEEE. Anger in a rebuttal is not just ineffective at MICRO — it is enumerated

as a rejection ground.

  • A separate Industry Track review. The inaugural 2026 track advertises a

review process tailored to production work — evidence standards that accommodate

proprietary constraints. Main-track novelty framing and industry-track deployment

framing are different games; know which one your paper entered.

What reviewers weigh in a microarchitecture paper

Composite of the community's public reviewing norms (not a quoted rubric — 待核实

against any published review form for the current cycle):

  1. Mechanism novelty and clarity — is there a new hardware idea, stated at

implementable precision?

  1. Methodology credibility — simulator, baseline strength, workloads, sampling;

the fastest score-killer in this community.

  1. Evidence-claim match — simulation claims sized to simulation fidelity

(micro-experiments instrument ladder).

  1. Cost honesty — storage/area/power/latency accounting present and plausible.
  2. Significance — does the headroom captured justify silicon change; would

anyone build it?

A practical corollary: reviewer expertise at MICRO skews toward *methodology

forensics*. Expect at least one review that reconstructs your simulator config from

the paper and interrogates the discrepancies.

Reading the outcome space

MICRO 2026's public timeline names one rebuttal/revision window and one

notification date; whether the cycle offered conditional accepts or shepherding is

待核实. Plan against the simple model:

accept    -> camera-ready sprint (Sept 11) + artifact evaluation decision
reject    -> triage: fixable-methodology vs wrong-venue vs insufficient-headroom
             next slots: ASPLOS Sept 9 '26 · ISCA Nov 17 '26 · HPCA July '27 · MICRO Apr '27
resubmit rule: fix what reviews falsified, re-verify every date on live pages

Keep the reviews regardless of outcome — architecture PCs overlap heavily across

MICRO/ISCA/HPCA/ASPLOS, and a resubmission that ignores prior reviews may meet its

own reviewer again.

Anatomy of a typical architecture review

Expect each review to contain, in some order: a summary paragraph (check it — a

wrong summary means the paper failed to communicate, and the rebuttal's first job

is a polite correction), a strengths list, a weaknesses list where methodology

items dominate, and detailed questions. Useful triage signals:

  • A review whose weaknesses are all questions is winnable in rebuttal; a review

whose weaknesses are all assertions needs numbers to move.

  • The most senior-sounding review is not automatically the decision driver; the

review with the most specific methodology engagement usually is.

  • Uniform mid-scores with shallow text often mean the paper landed outside every

reviewer's exact expertise — a topic-checkbox lesson for the resubmission.

Score scales, reviewer counts, and whether an online discussion precedes the PC

meeting are internal mechanics that vary by year: 待核实, do not assume.

Leverage points for authors

  • Before submission: topic checkboxes in HotCRP (steer toward mechanism

expertise), abstract quality (bidding happens on it), format cleanliness.

  • During review: nothing. Do not update linked repos in identifying ways; the

submission is frozen.

  • Rebuttal window: the only mid-process input — see micro-author-response

for how to spend two weeks well.

  • After notification: AE participation (badges strengthen the published

record), Top Picks nomination season (IEEE Micro selects from the year's

architecture papers).

Calibrating expectations

Flagship-architecture acceptance rates historically sit in the high-teens to

low-twenties percent (exact per-year figures 待核实 from PC-chair reports or the

proceedings front matter — do not quote a number without a source). The planning

consequence is not pessimism but lattice thinking: a strong paper's expected

path to publication is one to two cycles across the four venues, which is why

micro-workflow treats every submission as having a plan B with a date on it,

and why reviews — even from a rejection — are the highest-value artifact the

process returns.

Output format

[Stage] pre-submission / under review / rebuttal window / post-notification
[Days to next gate] <N days to date, per verified timeline>
[Reviewer-lens self-score] mechanism / methodology / evidence-match / cost / significance: 1-5 each
[Conduct check] rebuttal tone professional: yes / revise
[Outcome plan] accept path + reject path both written: yes / no
[待核实 before quoting] <items to reconfirm on microarch.org>

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。