跳到主要内容
知仓学习社ZHICANG

issta-workflow

Use when planning an ISSTA project timeline from venue fit through the January research-paper deadline, the March author response, the April first d…

不碰外部(只输出文字)无严重或高危命中brycewang-stanford/Awesome-Journal-Skills

它会碰到什么

扫了多少1 个文本文件,4 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

ISSTA Workflow

Use this as the project-management skill for an ISSTA submission. Replace every date below with the

current official timetable and work backward from the HotCRP deadline — ISSTA's calendar, and even

its number of deadlines, changes between editions.

ISSTA is a conference, not a journal: it has no standing editor-in-chief and no article-processing

charge. The rotating leadership is the per-edition General Chair and Program Chairs, appointed by

ACM SIGSOFT and turning over each year, and the cost model is registration, not APCs — proceedings

appear in the ACM Digital Library. Re-check the current organization page rather than carrying a

name forward.

Milestones (2026 shape — verify the current cycle)

  • Venue fit: confirm the contribution is genuinely testing-and-analysis, not a broader SE result.
  • Evidence lock: freeze the technique's scope, the subjects and benchmark versions, the

baselines, and the artifact plan.

  • Submission deadline (Jan 29, 2026): HotCRP record complete, 18-page anonymous sigconf PDF

uploaded, subjects pinned.

  • Author response (Mar 24-26, 2026): rebuttal anchored in submitted evidence.
  • First decision (Apr 16, 2026): Accept, Major Revision, or Reject.
  • Major-Revision deadline (May 21, 2026): revised paper plus a ledger walking every reviewer

comment.

  • Final decision (Jun 25, 2026): terminal outcome for revised papers.
  • Artifact evaluation: package for the ACM badges and the Zenodo deposit (separate track/dates).
  • Camera-ready and symposium (Oakland, Oct 3-9, 2026): ACM DL package, registration, in-person

presentation.

Backward plan from the paper deadline

| Weeks out (heuristic) | Testing/analysis milestone |

|---|---|

| 10+ | Technique implemented; scope and threat model fixed |

| 8 | Subjects and benchmark versions pinned; baselines configured at equal budget |

| 6 | Full evaluation runs complete with repeated runs and seeds logged |

| 4 | Statistics done (non-parametric test + effect size); tables generated from logs |

| 3 | Draft in ACM sigconf; threats-to-validity section written, not stubbed |

| 2 | Internal mock review by a testing-literate reader; artifact smoke-tested |

| 1 | Anonymity sweep; HotCRP record; artifact staging anonymized |

| 0 | 18-page PDF on HotCRP; confirm the abstract matches |

These offsets are planning heuristics only — anchor each to the current official timetable, never to

a previous cycle's calendar or deadline count.

Failure modes by stage

  • Treating Major Revision as a soft reject: teams that coast after April lose the June decision they

could have won by walking the reviewers' ledger.

  • Deferring the artifact to after acceptance: the badge and Zenodo work is real engineering, and a

tool that only ran on the authors' cluster earns nothing.

  • Leaving sigconf reflow to the final week: two-column code listings and full-width tables overflow

late.

  • Picking private subjects over an established benchmark: an evaluation that cannot be compared to

prior work invites an external-validity reject that no rebuttal fixes.

Coordination notes

  • Assign one owner for the artifact and Zenodo deposit and another for the anonymity sweep; shared

ownership is how both slip.

  • Archive the exact submitted PDF and artifact, because response and Major-Revision replies must

quote them precisely.

Output format

[Current stage] idea / evaluation / writing / submission / response / major-revision / accepted
[Next official deadline] <date and source, or unknown>
[Critical path] <three tasks that determine readiness>
[Risk register] <page/anonymity/evaluation/baseline/artifact/presentation>
[Owner map] <task -> person or role>

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。