跳到主要内容
知仓学习社ZHICANG

imc-workflow

Use when planning an ACM IMC campaign end to end, covering the choice between the two annual deadlines, backward planning from the target cutoff, th…

不碰外部(只输出文字)无严重或高危命中brycewang-stanford/Awesome-Journal-Skills

它会碰到什么

扫了多少1 个文本文件,4 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

IMC Workflow

Use this to plan an IMC campaign against the calendar. IMC runs two submission deadlines a year

with a shared review pipeline and a One-Shot-Revision path that resubmits to the next deadline.

Planning backward from the right deadline — and reserving time for ethics approvals and dataset

release that cannot be rushed — is the difference between a smooth cycle and a missed one.

Choose the deadline first

IMC 2026 offered two cycles: cycle 1 submission ~20 Nov 2025, cycle 2 submission ~29 Apr 2026

(confirm current dates on the Important Dates page). Choose by data-collection readiness, not

optimism:

  • If measurement and ethics approvals will be solid by the earlier cutoff, target cycle 1 — and a

One-Shot-Revision still lands you in cycle 2.

  • If data collection or IRB is unfinished, target cycle 2 rather than submitting thin work that

earns a reject instead of a revision.

Backward plan from the target cutoff

[T-0]     Submission deadline (AoE). PDF + BBL uploaded; availability declaration set.
[T-1wk]   Registration cutoff (title/abstract/authors/conflicts) — precedes submission by ~a week.
[T-2wk]   Final anonymity sweep (incl. vantage points); Ethics section finalized; artifact anonymized.
[T-4wk]   Freeze the measurement narrative; draft complete; limitations argued per-result.
[T-8wk]   Finish the decision-critical measurements; validate ground-truth subsamples.
[T-earlier] Obtain IRB determination; run active measurements safely; pin provenance as you collect.

Ethics approvals and longitudinal windows are the long poles — they cannot be compressed in the

final weeks.

The review-to-decision arc

[Submit] -> multi-round double-blind review
[Early reject] consensus-reject papers notified early -> reroute promptly (imc-topic-selection)
[Decision] Accept / One-Shot-Revision / Reject
   Accept            -> shepherding + camera-ready
   One-Shot-Revision -> execute the bounded action points; resubmit NEXT deadline, same reviewers
   Reject            -> reroute to SIGCOMM/NSDI/CoNEXT/PAM or a journal

The One-Shot-Revision leg

If you receive a One-Shot-Revision (imc-review-process, imc-author-response):

  • You have until the next deadline to execute a bounded action list (up to a few concrete

additions/changes) for the same reviewers.

  • Plan the additional measurements immediately — a new vantage point or a longitudinal extension

takes real calendar time.

  • Do exactly the named action points; resist scope creep that could cost the champion's support.

After acceptance

[Shepherding]   deliver the artifact you declared; the shepherd checks availability
[Camera-ready]  de-anonymize; finalize Ethics + availability statements; permanentize dataset/code
                links to a DOI archive (cycle 1 camera-ready ~mid-April; cycle 2 ~1 Sep — confirm)
[Award]         for the Community Contribution Award, the dataset/tool must be public + usable by
                the camera-ready deadline
[Present]       at least one author presents at IMC (Karlsruhe, Oct 12-16, 2026)

The Replicability Track calendar (if applicable)

If the contribution is replicating a prior measurement study, the path differs: submit an

Expression of Interest by its (earlier) deadline (IMC 2026 EoI ~29 Jan 2026), a small committee

screens it, and strong abstracts are invited to a full submission judged like the main track. Plan

the EoI well before you complete the replication.

Calibration

  • Every date is a per-edition snapshot — confirm both cycles' deadlines, the registration gap, and

the camera-ready dates on the current Important Dates page before committing.

  • Do not assume the One-Shot-Revision mechanics, the number of action points, or the Replicability

Track dates carry over between editions.

Output format

[Target] cycle 1 / cycle 2, with the reason (data + ethics readiness)
[Backward plan] <dates from data collection -> registration -> submission>
[Long poles] <IRB / longitudinal window / dataset release>
[Post-decision path] accept / one-shot-revision (next deadline) / reroute
[Release plan] shepherding + DOI archive by camera-ready; award eligibility

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。