ICSE Workflow

An ICSE campaign is a ten-month pipeline with one entrance. The 2027 cycle

(checked 2026-07-08 against the official dates pages) runs a **single

submission cycle** — a change from the two-cycle 2025/2026 model — so a missed

June deadline costs a full year, and the calendar below is the whole game.

The 2027-cycle master calendar

| Date (all AoE where applicable) | Milestone | Your workstream |

|---|---|---|

| Jun 23, 2026 | Abstract (mandatory) | Real title + abstract frozen |

| Jun 30, 2026 | Full paper deadline | 10+2 IEEE PDF, artifact link live |

| Jul–Aug 2026 | Reviews written | Prepare response infrastructure; rest |

| Sep 2026 | Author response window | Criterion-mapped replies (icse-author-response) |

| Oct 20, 2026 | Decisions: Accept / Major Revision / Reject | Branch: celebrate / sprint / reroute |

| Nov 17, 2026 | Major Revision due | Four-week revision sprint |

| Dec 18, 2026 | Final MR decisions | Terminal for the cycle |

| Early 2027 (待核实) | Artifact evaluation window | Badge submission (icse-artifact-evaluation) |

| 待核实 | Camera-ready due | +1 page allowance, IEEE production |

| Apr 25 – May 1, 2027 | ICSE in Dublin (core Apr 28–30) | Talk, artifact, networking plan |

Artifact-evaluation and camera-ready dates for 2027 were not posted at check

time; the 2026 edition ran artifact registration/submission in early January,

which is the planning anchor until real dates appear.

Working backward from June 30

A credible empirical-SE paper cannot be compressed into deadline month, because

its long poles — subject recruitment, benchmark construction, multi-week tool

runs, qualitative coding with a second rater — do not parallelize late. Plan

backward:

Jun 30  freeze: PDF + anonymized replication package
Jun 16  full internal mock review against the four criteria
Jun 02  results complete; threats-to-validity written from real limitations
May 05  evaluation running at scale; paper skeleton has real numbers
Apr 07  study design locked (RQs, baselines, metrics, subjects); pilot done
Mar 2026 and earlier: idea vetted with icse-topic-selection; related work swept

The two dates authors most often plan around wrongly: the **abstract deadline

is mandatory** (June 23 — a week before the paper, not a formality), and the

response window is September, which lands in teaching-start season for most

groups — reserve the days now.

Role assignments that prevent deadline-week chaos

  • Evidence owner — benchmarks, baselines, statistics; owns Jun 2 freeze.
  • Artifact owner — replication package, anonymization, availability

statement; owns the link that goes in the paper.

  • Prose owner — the 10-page budget, the threats section, the criterion

self-audit.

  • Process owner — HotCRP fields, conflicts, abstract registration,

calendar of every date above in the group calendar with AoE conversions.

One person can hold two hats; no hat may be unheld.

Branch plans after October 20

  • Accept: artifact-evaluation submission (badges are opt-in and

post-acceptance), camera-ready with the extra page, Dublin logistics.

  • Major Revision: the November sprint is pre-planned before October —

which experiments could be extended, which machines are free in November.

Groups that first think about feasibility on notification day lose a week

of the four.

  • Reject: reroute within weeks, not months. FSE and ASE deadlines

typically land in spring/summer, ISSTA in autumn/winter; TSE/TOSEM/EMSE take

extended versions year-round, and a journal acceptance can return to the

ICSE stage via journal-first (2027 window: papers accepted Oct 11, 2025 –

Oct 10, 2026 at TSE/TOSEM/EMSE). Check each venue's live dates — sibling

calendars move annually.

Cadence between milestones

The calendar above names endpoints; groups that hit them run a steady

between-milestone cadence: a weekly claims-vs-evidence review from April

(which headline claim is still unevidenced, who unblocks it), a biweekly

package build so the artifact never diverges more than two weeks from the

paper, and a standing "deadline minus 14" rehearsal where the current draft

is mock-reviewed against the four criteria by someone outside the author

list. The mock review is the cheapest Major-Revision insurance available:

it finds the missing-baseline and boilerplate-threats objections while

there is still a month to fix them rather than four weeks in November.

Cycle-volatility warnings

  • The single-cycle structure itself is the newest variable: 2025/2026 ran two

cycles, 2027 runs one. Verify the cycle count first each year, because it

changes every downstream date and the rerouting math.

  • Response format, artifact deadlines, camera-ready dates, and registration

rules were all unposted for 2027 at check time — 待核实 before promising

them to coauthors.

  • Do not let old two-cycle advice ("resubmit to cycle 2") leak into planning;

that lane does not exist in 2027.

Output format

[Cycle position] months to next ICSE deadline; feasible? yes/no
[Backward plan] dated milestones from today to freeze
[Owners] evidence / artifact / prose / process
[Branch readiness] MR sprint pre-plan? reroute venue + date named?
[Calendar risks] deadlines colliding with teaching/travel; AoE conversions done