跳到主要内容
知仓学习社ZHICANG

icdm-workflow

Use when planning an ICDM (IEEE International Conference on Data Mining) project timeline from venue fit through the abstract and full-paper deadlin…

不碰外部(只输出文字)无严重或高危命中brycewang-stanford/Awesome-Journal-Skills

它会碰到什么

扫了多少1 个文本文件,4 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

ICDM Workflow

Use this as the project-management skill for an ICDM submission. ICDM runs a **single

annual deadline**, so the plan is a one-shot sprint to June and then a long wait, not a

KDD-style cycle loop. Replace every date with the current edition's official timetable and

work backwards from the paper deadline.

ICDM is an IEEE conference, not a journal: there is no standing editor-in-chief and no

article-processing charge. The rotating analogue is the per-edition **General Chairs and

Program (PC) Co-Chairs**, appointed anew each year (2026 chairs 待核实 on the committee

page); the cost model is registration, and at least one author must present in person

for the paper to appear in the IEEE proceedings.

Milestones (2026 anchors — verify live)

  • Venue + track fit: confirm Research vs Applied vs Blue Sky (see icdm-topic-selection).
  • Evidence lock: freeze the mining task, mechanism, baselines, ablations, and scaling runs.
  • Abstract deadline (2026-05-30): register real title, abstract, authors, topics.
  • Full-paper deadline (2026-06-06, AoE): upload the anonymized 10-page PDF (Research).
  • The summer wait: reviews proceed triple-blind with, traditionally, no rebuttal.
  • Notification (2026-08-16): Accept / Accept-as-Short / Reject.
  • Camera-ready: IEEE eCopyright, de-anonymization, in-person registration.
  • Conference (Nov 12-15, Shenyang): present; the paper enters IEEE Xplore.

Backward plan from the June paper deadline

| Weeks out (heuristic) | Data-mining-methods milestone |

|---|---|

| 8+ | Mechanism fixed; mining task and baselines chosen |

| 6 | Ablations designed to isolate the mechanism |

| 4 | Scalability runs complete, seeds logged |

| 3 | Full draft compiled in IEEE two-column, measured against the 10-page all-inclusive cap |

| 2 | Internal mock review by a data-mining-minded reader |

| 1 | Triple-blind sweep, anonymized artifact export, appendix trimmed inside the cap |

| 0 | Abstract, then full paper on the submission system before AoE |

These offsets are heuristics — anchor every one to the current official timetable, never a

prior edition's calendar.

The two ICDM-specific branches

  • No-rebuttal posture. Plan as if you will get no chance to reply after reviews. That

means the submitted PDF and its cited anonymized repository must pre-answer the obvious

reviewer questions. If the current edition does open a response window, treat it as a

bonus, not the plan (see icdm-author-response).

  • Short-paper branch. Acceptance may arrive as "accepted as a short paper." Keep a

compression plan ready: which sections collapse, which results move to the repository,

and how the contribution survives at short-paper length (see icdm-camera-ready).

Failure modes by stage

  • Treating the appendix as free space and discovering at week 1 that references plus

appendix push the PDF past 10 pages — a no-review reject born of planning, not science.

  • Building the anonymized artifact after the deadline, under time pressure, is how a

triple-blind identity leak ships.

  • Assuming a rebuttal exists and leaving a known weakness "for the response" that never

comes.

  • Forgetting the in-person presentation requirement until camera-ready, when travel and

registration logistics are hardest.

Coordination notes

  • Assign one owner for the triple-blind sweep and another for the 10-page arithmetic;

shared ownership is how both slip.

  • Archive the exact submitted PDF and anonymized repository; if a response window opens,

replies must quote them precisely.

  • Diarize the August notification date so the short-paper branch can start immediately.

Output format

[Current stage] fit / experiments / writing / abstract / submission / waiting / decision / camera-ready
[Track] Research / Applied / Blue Sky
[Next official deadline] <date and source, or unknown>
[Critical path] <three tasks that determine readiness>
[Risk register] <10-page cap / anonymity / scale evidence / no-rebuttal exposure / presentation>
[Branch readiness] short-paper compression plan: ready / not ready

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。