跳到主要内容
知仓学习社ZHICANG

iccv-workflow

Use when project-managing an ICCV campaign across the odd-year cycle, covering the autumn fork between CVPR and ICCV, the early-March registration a…

不碰外部(只输出文字)无严重或高危命中brycewang-stanford/Awesome-Journal-Skills

它会碰到什么

扫了多少1 个文本文件,7 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

ICCV Workflow

An ICCV campaign runs on a spring-deadline, autumn-conference rhythm that only

exists in odd years. The 2025 cycle — the most recent completed one, verified

2026-07-08 — ran: paper registration March 3, full submission and supplementary

March 7 (11:59pm HST), reviews to authors May 9, rebuttal May 10–16, decisions late

June, conference October 19–23 in Honolulu (workshops the 19th–20th, main program

the 21st–23rd). ICCV 2027 is announced for Hong Kong in early October 2027; its

deadline chain was unpublished at check time, so every date below is a

2025-cycle anchor for shape, not a promise.

The autumn fork (the decision nobody schedules)

The ICCV cycle actually begins the previous autumn, when the team must choose

between the imminent CVPR deadline (November) and holding four more months for

ICCV (March). Make the fork an explicit meeting with a written outcome:

  • Hold for ICCV when the missing evidence is real (a benchmark, a user study, a

second domain) and four months genuinely closes it.

  • Take CVPR when the paper is submittable now — holding a finished paper four

months in a field with weekly arXiv turnover is negative-expected-value.

  • Never split the difference by submitting to CVPR "as a free review round";

overlapping CVF reviewer pools remember, and dual-submission windows can trap a

paper that gets held over.

Cycle plan with owners (2025-shaped)

| Window | Milestone | Failure this window causes |

|---|---|---|

| Sep–Oct (year before) | Autumn fork decided; claims frozen in one paragraph | Zombie project drifting between deadlines |

| Nov–Dec | Experiment matrix runs; draft skeleton with figure slots | March becomes an experiments deadline, not a writing one |

| Jan | Full internal draft; outside reader pass | No time to act on feedback |

| Feb | Baseline-freshness audit; anonymity sweep; supplement built in parallel | Same-day supplement rule catches the team |

| ~Mar 3 | Registration: title, abstract, full author list, complete OpenReview profiles | Registration lapse = no submission |

| ~Mar 7 | Paper + supplement, one upload event (2025: 11:59pm HST) | Anything unfinished is unfinished forever |

| Mar–May | Coauthors serve reviewer assignments — every author reviews at ICCV | Late reviews can desk-reject your paper |

| ~May 9–16 | Reviews land; seven-day rebuttal | Week lost to shock instead of triage |

| Late Jun | Decision | No plan B drafted |

| Summer | Camera-ready (exact 2025 deadline 待核实); artifact release runway | Promises to reviewers quietly expire |

| Oct | Conference week abroad | Visa/travel booked too late |

Note the timezone trap: 2025's deadline was Hawaii Standard Time — generous for

Europe and Asia, but teams that reflexively assume AoE have missed CVF deadlines

in both directions. Read the clock on the current Dates page, not from habit.

Two ICCV-specific project risks

The unified deadline. Since 2025, ICCV takes paper and supplementary material

on the same day (an announced process change — it also shortened the decision

timeline). Plan the supplement as a parallel workstream from February, with its

own owner. Teams migrating from CVPR habits still budget a "supplement week" that

no longer exists.

Reviewer duty with teeth. Every author is expected to review unless exempt

(those new to or outside the vision community were exempted in 2025), each author

may register at most 25 submissions, and the 2025 chairs enforced quality: 25

reviewers were judged highly irresponsible and 29 of their authored papers were

desk-rejected, 12 of which would otherwise have been accepted. Treat coauthor

review assignments as deliverables on the project plan with a senior reviewer

proofreading first-timers' drafts.

International logistics are part of the plan

ICCV rotates internationally by design — Honolulu in 2025, Hong Kong announced for

  1. For many team members that means visas, and visa appointment queues in some

countries exceed the June-decision-to-October-conference gap. Do not wait for the

decision:

travel-readiness ledger (start at submission, not at acceptance)
  per author:  passport expiry ≥ 6 months past conference?  visa type needed?
               appointment backlog in their country (weeks)?
  per paper:   who presents if the first author cannot travel?
               funding source confirmed for at least one presenter?
  deadline:    visa paperwork drafted by decision day, filed within a week of it

The fallback ladder (the biennial part)

Missing ICCV costs two years of ICCV, but not two years of publishing. Draft the

ladder before decisions arrive:

  1. Reviews were fixable → ECCV (the following even-year spring) or the next

CVPR (November): repair every factual objection first; pools overlap.

  1. Reviews said "sound but not exciting" → in 2025, the new Findings workshop

accepted technically sound rejected/withdrawn ICCV papers (a post-decision

outlet — check whether it recurs); or WACV for application-leaning work.

  1. Reviews revealed a missing foundation → journal track (TPAMI/IJCV) after

real revision, or back to the bench.

  1. Idea overtaken during review → salvage the reusable component; do not

resubmit a superseded comparison table anywhere.

Multi-paper labs, odd-year edition

In odd years a vision lab may push papers at CVPR (Nov), ICCV (Mar), and ICCV

workshops (summer CFPs) with the same people. Lab-level coordination: one shared

duty roster (a single delinquent reviewer-coauthor endangers every ICCV paper the

lab submitted), one shared compute reservation for rebuttal week in May, and one

person owning OpenReview profile hygiene across all submissions — the 2025 cycle

required complete profiles at registration.

Reverify before trusting any date here

  • The entire 2027 chain: registration/paper deadlines, timezone, rebuttal window,

decision date, camera-ready — all 待核实 until iccv.thecvf.com posts them.

  • Whether the single paper+supplement deadline persists.
  • Whether Findings runs again in 2027.
  • Registration and presentation obligations for accepted papers (not verified

even for 2025 — 待核实).

Output format

[Cycle position] autumn-fork / building / deadline-month / in-review / rebuttal / decided / pre-conference
[Next 3 milestones] <date — item — owner>
[Duty roster] coauthor reviewer assignments tracked: yes/no
[Supplement workstream] parallel owner assigned: yes/no
[Travel readiness] visas/funding per presenter: green/amber/red
[Fallback ladder] <ranked next venues with their real deadlines>

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。