跳到主要内容
知仓学习社ZHICANG

cscw-workflow

Use when planning a CSCW submission timeline end to end — the PACMHCI journal model, the retired fixed cycles versus the rolling 2027+ pathway, Revi…

不碰外部(只输出文字)无严重或高危命中brycewang-stanford/Awesome-Journal-Skills

它会碰到什么

扫了多少1 个文本文件,5 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

CSCW Workflow

CSCW is not a deadline sprint. Since 2017 its papers have been journal articles in

PACMHCI, and since early 2026 the venue has been rolling out a fully journal-style

pipeline: **submit whenever the paper is ready, expect a decision in roughly 3-4

months, revise on the editor's clock, and present at whichever conference your

acceptance lands in front of.** Planning a CSCW project therefore means planning a

revision campaign, not a submission night.

The two regimes (as of 2026-07-08)

| Aspect | Fixed cycles (through the May 2025 cycle) | Rolling (CSCW 2027 and beyond) |

| --- | --- | --- |

| Deadline | Hard cutoff (last: May 14, 2025, 12:00 EDT) | None — submit when ready |

| Platform | PCS | Manuscript Central (mc.manuscriptcentral.com/pacmhci) |

| Who handles the paper | Program committee (ACs) per cycle | Editorial board: EiC/AE by methodological track |

| First decision | Batched (first-round decisions ~6 months in) | Rolling, ~3-4 months from submission |

| Revision windows | Fixed dates (e.g., R&R due January 13, 2026) | Set per paper by the handling editor |

| Conference tie | Cycle mapped to a specific conference year | Accepted papers invited to the next CSCW, pending space |

The May 2025 cycle — the last of the old kind — is worth studying as a calibration

anchor even though it will never recur: submissions May 14, 2025 → internal

"Revise for External Review" resubmissions September 16, 2025 → first external

decisions November 2025 (66.2% of papers got Revise and Resubmit; only a third got

any final decision) → revised papers due January 13, 2026 → final decisions late

March 2026 → presentation at CSCW 2026 (Salt Lake City, October 10-14, 2026). That

is a 17-month arc from submission to podium, and two-thirds of surviving papers

went through the full R&R loop.

Cycle-hopping, translated for the rolling era

Under fixed cycles, authors managed risk by "hopping": if an R&R could not be turned

around by the resubmission date, the revision rolled into a later cycle and a later

conference. Rolling keeps the underlying skill and removes the calendar: the hop is

now a negotiation with time, not with a deadline table. Practical consequences:

  • Submission date is a strategic variable. Count backward from the conference

you want to attend: with ~3-4 months to first decision and a realistic multi-week

revision round (PACMHCI revision periods are measured in weeks-to-months, not

days), a paper submitted less than ~8-10 months before a conference is betting on

a clean first decision. The exact cutoff by which a rolling acceptance is assigned

to CSCW 2027 versus 2028 was 待核实 at check time — confirm it on

cscw.acm.org/rolling.html before promising a travel year to anyone.

  • Revision capacity is the bottleneck. An R&R that demands new data collection

(a second interview wave, another deployment period) costs a season. Budget the

team's field access before submitting, not when the decision arrives.

  • Nothing forces you to submit early — or lets you cram. The rolling model

rewards submitting a genuinely finished paper over hitting an arbitrary date with

a rushed one; there is no deadline-night adrenaline to launder weak sections.

Campaign plan skeleton

[T0]       Internal full-draft review (simulate first-round: one skeptic per
           method tradition in the paper)
[T0+2wk]   Ethics/consent artifacts final; anonymization sweep #1
[T0+4wk]   Submit via the current platform (verify regime first)
[T0+4mo]   Expected decision window opens — pre-book revision capacity:
           who re-codes, who re-runs analyses, who drafts the response letter
[R&R]      Treat as a project phase with an owner, not a chore
           (see cscw-author-response)
[Accept]   Camera-ready + PACMHCI production (see cscw-camera-ready);
           confirm which conference year the paper presents at
[Confab]   Registration, travel, talk prep for the assigned CSCW

Risks specific to this venue's shape

  • Stale-regime planning. Advice, blog posts, and lab lore calibrated to PCS

cycles is now wrong. Verify the live pathway before every new submission.

  • Indefinite-polish drift. With no deadline, drafts can orbit forever. Set an

internal submission date and treat it as real.

  • Same-reviewers memory. R&R rounds return to the same reviewers; a revision

that quietly ignores a request will be caught by the person who made it.

  • Presentation-slot ambiguity. "Invited to present at the next conference,

pending space" is a softer guarantee than a proceedings deadline; keep travel

plans provisional until the assignment is explicit.

Status-report format

[Regime] rolling / residual fixed-cycle (verified <date> at cscw.acm.org)
[Stage] drafting / submitted / R&R round n / minor changes / production
[Clock] time since submission or since revision request
[Bottleneck] <the one resource gating the next stage>
[Conference target] CSCW <year> — assignment confirmed? yes / no / 待核实

Dates and statistics above are the 2026-07-08 snapshot of a venue mid-transition;

recheck cscw.acm.org and the rolling CFP before treating any of them as current.

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。