跳到主要内容
知仓学习社ZHICANG

conext-workflow

Use when planning an ACM CoNEXT campaign backward from a deadline, covering the choice between the December and June submission cycles, the mandator…

不碰外部(只输出文字)无严重或高危命中brycewang-stanford/Awesome-Journal-Skills

它会碰到什么

扫了多少1 个文本文件,5 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

CoNEXT Workflow

Plan the whole campaign backward from the cutoff. CoNEXT's defining feature is **two submission

cycles a year — a December deadline and a June** deadline — both feeding one annual program

and one rolling PACMNET volume. The first decision is therefore not "when do I write?" but "which

cycle am I targeting, and is my evidence ready for it?" Every date below is the CoNEXT 2026 snapshot

read on 2026-07-09 (see [../../resources/official-source-map.md](../../resources/official-source-map.md));

reopen the live Important Dates page before committing.

Choose the cycle

[December cycle]  register 5 Dec 2025 -> submit 12 Dec 2025 -> early-reject Feb 2026
                  -> notify 31 Mar 2026 -> camera-ready 30 Apr 2026 -> June 2026 PACMNET issue
   (major revision path) revision due 29 May 2026 -> resubmit 5 Jun 2026 -> camera-ready 31 Jul 2026
[June cycle]      submit 5 Jun 2026 -> (its own review round, notification, and later PACMNET issue)
  • Target the nearer honest deadline your evidence is actually ready for. A half-finished testbed

campaign rushed into December scores worse than a complete one in June.

  • If you earn a one-shot major revision in the December cycle, the resubmission lands in the spring —

so the two cycles are two entry points into the same program, not two separate conferences.

  • Both cycles publish in PACMNET; the issue you land in depends on your cycle and revision path.

Backward plan from a chosen cutoff (T = submission day)

T minus 12-16 weeks  Lock the contribution and the evaluation platform (testbed/deployment/trace).
                     Run conext-topic-selection: CoNEXT vs SIGCOMM/NSDI/IMC, and December vs June.
T minus 8-12 weeks   Build evidence with conext-experiments + conext-reproducibility. Pin traces,
                     configs, firmware/OS versions NOW — they cannot be reconstructed later.
T minus 4-8 weeks    Draft against conext-writing-style and the worked example. Positioning with
                     conext-related-work. Decide the body/appendix/artifact split (conext-supplementary).
T minus 2 weeks      Freeze the body. Build the anonymized artifact. Decide badging.
T minus 1 week       REGISTER (title/abstract/authors/conflicts). OPT IN for the reproducibility
                     badge before the submission deadline if you want it.
T minus 1-2 days     conext-submission end to end: acmart budget, double-anonymous sweep, HotCRP
                     fields, conflicts.
T                    Submit; re-download and read the uploaded PDF cold.

After submission

[Early-reject window]   Some cycles notify clearly-below-bar papers partway through. No action but
                        to plan the next cycle or a sibling venue if it comes.
[Reviews / discussion]  Two rounds + TPC meeting. Prepare an initial rebuttal if the cycle offers one
                        (conext-author-response, Turn 1).
[Decision]              Accept / Reject / one-shot major revision.
[One-shot revision]     ~2 months to address the minimum-necessary changes; same reviewers re-read
                        once; a shepherd checks the changes (conext-author-response, Turn 2).
[Accept]                Camera-ready to acmart + PACMNET metadata (conext-camera-ready). If you opted
                        in, send the one-page artifact description within a week (conext-artifact-evaluation).
[Reject]                No appeal. Reroute via conext-topic-selection to a sibling venue or the other
                        CoNEXT cycle, revised.

Roles and hand-offs

  • Registration owner — one author confirms title/abstract/authors/conflicts before the earlier

registration cutoff; a missed registration means no submission slot.

  • Artifact owner — pins traces/configs and stages the anonymized artifact; owns the badge opt-in

before submission and the one-page description after acceptance.

  • Anonymity owner — runs the double-anonymous sweep on the final PDF, figures (topologies!), and

archive, and on the major-revision response letter.

  • Shepherd liaison — after a revision or conditional accept, the corresponding author tracks each

required change to a tracked edit for the shepherd.

Calendar hygiene

  • Confirm both cycles' exact dates and time zones each year; CoNEXT re-posts them per edition.
  • Do not assume the December and June cycles share every rule (page budget, revision window); verify

the one you are in.

  • Watch the co-located Student Workshop and any workshops if a shorter or student-facing venue

fits ongoing work better (see [conext-topic-selection](../conext-topic-selection/SKILL.md)).

Output format

[Target] CoNEXT <year>, <December | June> cycle, submission <date + time zone>
[Backward plan] <milestones with dates: platform freeze, evidence, draft, register, opt-in, submit>
[Risk] <the milestone most likely to slip, and the fallback cycle/venue>
[Post-submission] <decision-contingent branches: revision window, camera-ready, badge>

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。