跳到主要内容
知仓学习社ZHICANG

arecon-review-process

Use when calibrating expectations for the Annual Review of Economics (ARE) Editorial Committee review cycle on an invited article — what happens aft…

不碰外部(只输出文字)无严重或高危命中brycewang-stanford/Awesome-Journal-Skills

它会碰到什么

扫了多少1 个文本文件,5 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

Review Process — What to Expect (arecon-review-process)

When to trigger

  • The commissioned draft is delivered and you want to know what happens next
  • You are unsure whether an invited review is auto-accepted (it is not) and what it is judged on
  • You need to plan around the annual-volume production schedule
  • A coauthor expects journal-style turnaround and you must reset that to the Committee cadence

How an invited ARE review is evaluated

Being invited gets your draft reviewed, not accepted. After delivery, the Editorial Committee assesses the manuscript for accuracy, rigor, and balance, and may route it to another Committee member or an external expert as appropriate (检索于 2026-06;以官网为准). The bar is the review-article bar, not the primary-research bar:

| Stage | What happens | What it tests |

|-------|-------------|---------------|

| Commissioning | Committee invites the topic/author; scope is set | fit, author standing, ARE-shaped topic |

| Delivery | author submits the invited draft in the commissioned workflow | completeness, format, declarations |

| Committee/expert review | a Committee member and/or external referee read it | accuracy, rigor, balance, accessibility, coverage |

| Revision | author addresses comments (see arecon-revision) | gaps closed; fairness restored; spine sharpened |

| Production | production editor copyedits, sets figures, applies house style | format, references, figure quality |

| Volume publication | article appears in the annual volume (open access under S2O) | — |

Special-case integrity: if a Committee member is the author, they do not participate in reviewing their own article, which is handled by another member or external expert under the same policies (检索于 2026-06;以官网为准).

Timeline reality

ARE runs on an annual cadence: one volume per year with fixed production deadlines (检索于 2026-06;以官网为准). This differs sharply from a rolling journal — there is no continuous queue, and a draft that misses a volume's production window can slip to the next volume. Treat the production editor's schedule as the binding constraint and plan revision time backward from it. Do not assume journal-style "decision in N months"; confirm the specific volume timeline with the editor.

What referees push on (and how to pre-empt)

Because ARE referees judge the review as a review, the predictable pushbacks are upstream-preventable:

  • "You omit literature X."arecon-literature-synthesis saturation log; close the gap before delivery.
  • "This slights school Z / over-cites the author."arecon-evidence-standards balance + self-citation audit.
  • "This reads like an annotated bibliography."arecon-organizing-framework; make the spine explicit.
  • "A non-specialist can't follow Section 4."arecon-writing-style; intuition-first.
  • "You mischaracterize study W." → fix precisely; the reviewed author may be the referee.

Checklist

  • [ ] Team understands invitation ≠ acceptance; the draft is reviewed for accuracy/rigor/balance
  • [ ] Expectations set to the annual-volume cadence, not journal rolling turnaround
  • [ ] Production deadline obtained; revision time planned backward from it
  • [ ] The five predictable referee pushbacks pre-empted upstream before delivery
  • [ ] Any author–Committee conflict-of-interest handled per Annual Reviews policy
  • [ ] Volatile timeline/process re-confirmed with the editor / on the author pages

Anti-patterns

  • Assuming an invited review is rubber-stamped — it is refereed for rigor and balance
  • Expecting rolling-journal turnaround instead of an annual production schedule
  • Discovering a coverage or balance problem at review that the saturation log would have caught
  • Missing the volume production window and slipping a full year
  • Quoting a specific decision timeline from memory rather than confirming the volume schedule

Output format

【Stage】commissioning / delivery / Committee-review / revision / production
【Bar】judged on accuracy + rigor + balance + accessibility + coverage? confirmed
【Cadence】annual volume; production deadline obtained? Y/N · 待核实
【Pre-empted pushbacks】coverage / balance / framework / accessibility / appraisal — checked? Y/N
【COI】author–Committee conflicts handled per policy? Y/N
【Next step】→ arecon-revision (after the comments) → arecon-submission (re-deliver)

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。