跳到主要内容
知仓学习社ZHICANG

acmmm-workflow

Use when planning the end-to-end ACM MM (ACM Multimedia) campaign calendar — from thematic-area scoping and track choice, through the April OpenRevi…

不碰外部(只输出文字)无严重或高危命中brycewang-stanford/Awesome-Journal-Skills

它会碰到什么

扫了多少1 个文本文件,5 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

ACM MM Workflow

Use this to run an ACM Multimedia submission as a scheduled campaign rather than a

deadline scramble. The SIGMM calendar has a long gap between the April submission chain and

the July decision, so the work clusters at the front and the back.

The ACM MM calendar (2026 anchors, AoE)

| Phase | 2026 date | What must be true | Skill |

|---|---|---|---|

| Scope + track choice | pre-March | Contribution is cross-modal; thematic area and track chosen | acmmm-topic-selection |

| Draft + evidence | March | First page leads with the multimedia claim; ablations planned | acmmm-writing-style, acmmm-experiments |

| Abstract | Mar 25 | Abstract registered in OpenReview | acmmm-submission |

| Paper | Apr 1 | 6–8 sigconf pages, anonymous, final PDF | acmmm-submission |

| Supplement | Apr 8 | Media/appendix package, anonymous, plays | acmmm-supplementary |

| Rebuttal | ~Jun 4 | Anonymous response, small confirmatory results | acmmm-author-response |

| Notification | ~early Jul | Decision + tier | acmmm-review-process |

| Camera-ready | ~Aug 6 | De-anonymized ACM version, artifact released | acmmm-camera-ready |

| Conference | Nov 10–14 | Registered; media-ready talk/poster | acmmm-camera-ready |

Treat these dates as the 2026 snapshot; reopen the current site each cycle. Note the 2026

notification date was listed inconsistently (July 7 on the CFP vs. July 9 elsewhere).

Front-loaded work (before April)

The April chain is unforgiving because three deadlines land in eight days. Do the slow work

early:

  • Lock the thematic area and track — they set format and blinding, and switching late is

expensive.

  • Build the cross-modal evidence: matched baselines and the leave-one-modality-out

ablation that proves the fusion matters.

  • Plan any user study now; recruiting raters cannot be done in the final week.
  • Draft so the first page already leads with the multimedia contribution.

The three-deadline sprint

T-14d: freeze claims; media assets rendering from scripts
T-7d:  body fits 6-8 sigconf pages; references on overflow pages only
Mar 25: abstract registered (do not miss the earliest deadline)
Apr 1:  paper PDF final, anonymous, metadata-clean
Apr 8:  supplement packaged, anonymous, media plays for a stranger

The long gap and the rebuttal

Between April and June, prepare the confirmatory experiments a reviewer is likely to ask for

(the missing baseline, the extra ablation) so the June rebuttal is a matter of reporting

results, not scrambling to run them.

Back end (July–November)

  • On acceptance, de-anonymize, complete ACM rights/CCS, and release the public artifact.
  • Register early and plan travel to Rio; visas and international logistics are the usual

failure.

  • Build a presentation that plays the media — the seam between modalities should be

seen/heard, not just described.

  • On rejection, use the reviews to re-target: MM Asia, ICMR, a workshop, or next year's MM.

Risk register

| Risk | Where it bites | Mitigation |

|---|---|---|

| Missing the abstract deadline | Mar 25 forecloses the paper | Register the abstract days early |

| Wrong track blinding | Desk reject | Confirm the track call before formatting |

| Fusion not shown to matter | Reviews / rebuttal | Run the leave-one-modality-out ablation pre-submission |

| User study not recruited in time | Perceptual claim unbacked | Start recruiting before April |

| Broken anonymous media link | Lost evidence in review | Test the mirror from a clean machine |

| Rio travel/visa delay | Cannot present | Start visa paperwork at acceptance |

Re-targeting after a rejection

An ACM MM rejection is not the end of the work. Match the reviews to the next move: a

retrieval-leaning paper can go to ICMR; a systems-leaning one to MMSys; a regionally

scoped or earlier-stage result to ACM Multimedia Asia or a workshop; a matured version

to the ACM TOMM journal or next year's ACM MM. Fix the decisive critique — usually the

cross-modal-significance one — before resubmitting anywhere.

Output format

[Current phase] <scope/draft/abstract/paper/supplement/rebuttal/decision/camera-ready/conference>
[On track?] yes / at-risk: <what slips>
[Next deadline] <date + deliverable>
[Active skill] <which skill to run now>
[Risks] <ordered>

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。