project-planning
Converts a specification into a phased, dependency-ordered implementation plan. Use after specification is complete and before execution begins.
它会碰到什么
这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。
技能内容
Delegation
For detailed task planning workflows, this skill delegates to spec-kit:task-planning as the canonical implementation. Use this skill for quick planning needs; use spec-kit for thorough project plans.
When To Use
- After specification phase completes
- Need to design system architecture
- Need task breakdown for implementation
- Planning sprints and resource allocation
- Converting requirements into concrete tasks
- Defining component interfaces and dependencies
When NOT To Use
- No specification exists yet (use
Skill(attune:project-specification)first) - Still exploring problem space (use
Skill(attune:project-brainstorming)instead) - Ready to execute existing plan (use
Skill(attune:project-execution)instead) - Need to adjust running project (update plan incrementally, don't restart)
Integration
With superpowers:
- Uses
Skill(superpowers:writing-plans)for structured planning - Applies checkpoint-based execution patterns
- Uses dependency analysis framework
Without superpowers:
- Standalone planning methodology
- Task breakdown templates
- Dependency tracking patterns
Quality Checks
Before completing plan:
- ✅ All architecture components documented
- ✅ File Structure section present before tasks
- ✅ All task files appear in File Structure table
- ✅ All FRs mapped to tasks
- ✅ All tasks have acceptance criteria
- ✅ Dependencies are acyclic
- ✅ Effort estimates provided
- ✅ Critical path identified
- ✅ Risks assessed with mitigations
- ✅ Sprints balanced by capacity
Record the Tradeoff (decision journal)
Planning is where architecture and scope decisions get made: the pattern
chosen, the dependency accepted, the work deferred. Record each decision that
had real alternatives to docs/tradeoffs.md (draft and confirm):
- If leyline is installed, invoke
Skill(leyline:decision-journal)and append
a tradeoff entry (the decision, the options weighed, and what was
sacrificed; set phase to plan). Show the draft; append on confirmation.
- Fallback (leyline absent): append to
docs/tradeoffs.mdusing the in-file
ENTRY TEMPLATE; assign the next TR-NNN id.
Post-Completion: Workflow Continuation (REQUIRED)
Automatic Trigger: After Quality Checks pass and docs/implementation-plan.md is saved, MUST auto-invoke the next phase.
When continuation is invoked:
- Verify
docs/implementation-plan.mdexists and is non-empty - Display checkpoint message to user:
Implementation plan complete. Saved to docs/implementation-plan.md.
Proceeding to execution phase...
- Invoke next phase:
Skill(attune:project-execution)
Bypass Conditions (ONLY skip continuation if ANY true):
--standaloneflag was provided by the userdocs/implementation-plan.mddoes not exist or is empty (phase failed)- User explicitly requests to stop after planning
Do NOT prompt the user for confirmation: this is a lightweight checkpoint, not an interactive gate. The user can always interrupt if needed.
Exit Criteria
- [ ]
docs/implementation-plan.mdexists, is non-empty, and passes Quality
Checks (acyclic dependencies, FRs mapped, critical path identified).
- [ ] Architecture and scope decisions with alternatives are recorded to
docs/tradeoffs.md.
- [ ] The execution phase is auto-invoked unless a bypass condition holds.
Related Skills
Skill(superpowers:writing-plans)- Planning methodology (if available)Skill(spec-kit:task-planning)- Task breakdown (if available)Skill(attune:project-specification)- Previous phaseSkill(attune:project-execution)- AUTO-INVOKED next phase after planningSkill(attune:mission-orchestrator)- Full lifecycle orchestration
Related Commands
/attune:blueprint- Invoke this skill/attune:execute- Next step in workflow
Examples
See /attune:blueprint command documentation for complete examples.
Troubleshooting
Common Issues
If you find circular dependencies in your task graph, break one of the tasks into smaller sub-tasks. If sprint capacity is consistently exceeded, re-estimate tasks using the Fibonacci scale or reduce sprint scope.
想直接用这个技能?
本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。
它属于哪个仓库
plugins/attune/skills/project-planning/SKILL.md同一个仓库里的其他技能
- claude-code-plugin-reference
- night-market-architecture-contract
- night-market-build-and-env
- night-market-change-control
- night-market-collective-memory
- night-market-completion-integrity-campaign
- night-market-config-catalog
- night-market-debugging-playbook
- night-market-diagnostics-toolkit
- night-market-docs-and-writing
- night-market-failure-archaeology
- night-market-model-and-harness-updates