跳到主要内容
知仓学习社ZHICANG

capacity-planner

Use when an ops leader (Director of CX, Head of Support, VP Ops, Head of BizOps, Head of IT ops, Head of Finance ops) is sizing ops capacity, buildi…

不碰外部(只输出文字)无严重或高危命中alirezarezvani/claude-skills

它会碰到什么

扫了多少8 个文本文件,75 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

capacity-planner

Sizing tool for ops teams that handle queued work — Support, CX,

Customer Success, BizOps, IT ops, Finance ops. Built on Erlang-C

queueing theory, Little's Law, and the operational-leadership canon

(Fournier, Larson, Cleveland, Reinertsen). Deterministic, stdlib-only,

no LLM calls.

Purpose

You are an ops leader sized 15 → 35 with no idea how the 35-person org

will actually behave at peak load. Or you are at 88% utilization and

SLA is starting to slip. Or you have a hiring budget approved and need

to sequence it across four quarters without burning out the existing

team. This skill answers those questions with arithmetic, not vibes.

It produces three artifacts:

  1. Capacity sizing at 70/80/90% utilization against P50/P90/P99

demand, with P(SLA breach) at each point and a SAFE/WATCH/AT_RISK/CRITICAL

risk band.

  1. Utilization health at the per-member traffic-light level plus a

team verdict (HEALTHY/SQUEEZED/OVERLOADED/UNBALANCED).

  1. 12-month quarterly hiring plan accounting for ramp curves,

attrition, QoQ demand growth, and span-of-control manager triggers.

When to use

  • Annual ops capacity planning (October-November for the following

fiscal year).

  • Quarterly re-sizing if demand changed >15% or attrition spiked.
  • Pre-budget defense — the math that justifies the headcount ask

to your CFO.

  • Diagnostic when an ops team is missing SLA and you need to know

whether it's a sizing problem, a process problem, or a bottleneck

problem.

  • M&A / new-segment launch modeling — sizing a new team or

combined org.

Workflow

  1. Intake demand. Pull P50/P90/P99 daily ticket/case volume from

your work system (Zendesk, Intercom, JSM, ServiceNow, Salesforce).

If you only have averages, stop and pull the distribution. Single-

point demand estimates are the most expensive anti-pattern in ops.

  1. Model throughput. Run capacity_modeler.py with your demand,

AHT, SLA target, current FTE, and shrinkage. Use --profile for

your function (support / cx / bizops / finance-ops / it-ops). Read

the 80%-utilization row — that's your sizing point.

  1. Flag utilization risk. Run utilization_analyzer.py against

your current team's actual utilization data. Anyone >85% sustained

is a throughput-collapse risk per Reinertsen. Spread >30 percentage

points across team means UNBALANCED — fix that before hiring.

  1. Sequence hiring. Run hiring_sequencer.py with current FTE,

target EOY, ramp time, attrition, and growth. It will front-load

hires (Q1 35%, Q4 15%), apply ramp curves, and trigger a manager

hire when span of control crosses 7 ICs/manager.

  1. Walk the Forcing-question library (see below). One question at

a time. Do not skip ahead. Answers must be written down before

you commit the plan.

Scripts

  • scripts/capacity_modeler.py — Erlang-C sizing with shrinkage

adjustment and P50/P90/P99 breach probabilities. --profile

for industry defaults.

  • scripts/utilization_analyzer.py — per-member traffic-light +

team-level health verdict with variance detection.

  • scripts/hiring_sequencer.py — 12-month quarterly plan with ramp,

attrition, growth, max-hires-per-quarter constraint, and

manager-trigger logic.

All three accept --input <path> (JSON), --output {markdown,json},

--sample (built-in example), and --help. Stdlib only.

Quick example

# Emits an Erlang-C capacity model (required headcount + P50/P90/P99 breach probabilities) for the built-in example
cd business-operations/skills/capacity-planner && python3 scripts/capacity_modeler.py --sample

References

  • references/queueing_theory_canon.md — Erlang, Little, Hopp &

Spearman, Reinertsen, Kingman, Cleveland, ITIL, Armony et al. (8

sources). The math.

  • references/ops_workforce_planning_canon.md — Fournier, Larson,

Google SRE Workbook, Frei, Lawler, Bersin, Gartner, Grove (8

sources). The people factors.

  • references/capacity_anti_patterns.md — 11 named anti-patterns

with cited sources, tool guards, and the meta-discipline that

Lencioni + Goldratt + Christensen impose. (8+ named sources.)

Assets

  • assets/capacity_brief_template.md — 20-minute fill-out template

with JSON skeletons for all three tools and an output checklist.

Assumptions

This skill assumes:

  • Work is queued (tickets, cases, work items) — not project-style.

If your team's work isn't queued, this is the wrong skill.

  • Demand has a stationary-enough distribution within a quarter.

Step-changes (new product launch, M&A, regulatory shift) require

re-running mid-quarter.

  • You have at least 90 days of historical demand data to compute

P50/P90/P99. If not, generate the distribution from your sales /

user-base forecast first.

  • Service is single-class within a queue. If you have hard

priority tiers (P1/P2/P3 with class-specific SLAs), model each as

a separate queue and sum.

  • Channels are modeled coherently. Multi-channel teams use the

appropriate --profile with built-in shrinkage premium.

Anti-patterns

See references/capacity_anti_patterns.md for the full taxonomy with

sources. Top eight:

  1. Plan-to-100%-utilization (Reinertsen Principle 12)
  2. Treat-ramp-as-instant (Larson)
  3. Ignore-attrition-in-12-month-plan (Bersin)
  4. Hire-ICs-forever-with-no-manager-trigger (Fournier)
  5. Size-to-P50-demand-only (Cleveland)
  6. No-shrinkage-adjustment (Cleveland, SRE Workbook)
  7. Single-channel-model-for-multi-channel-work (Gartner, Kingman)
  8. No-surge-plan-for-P99-events (Hopp & Spearman, Reinertsen)

Distinct from

  • c-level-advisor/vpe-advisor measures engineering throughput

via DORA 4 metrics, story points, deployment frequency, and cycle

time bottlenecks. It is for engineering teams shipping code. This

skill is for ops teams handling tickets/cases. Different unit of

work, different math (Erlang-C vs. DORA), different bottleneck

(queueing-blind staffing vs. WIP + lead time).

  • c-level-advisor/chro-advisor does strategic workforce

planning (1-5 year capability portfolios, talent supply, leadership

succession). This skill does operational 0-12 month capacity

sizing against demand. Per Lawler: conflating them gets you hired

into the wrong jobs.

  • **project-management/* tracks delivery throughput on projects

(Jira velocity, sprint capacity). This skill sizes around steady-

state queued work.

  • Sibling process-mapper finds the bottleneck. This skill

sizes the team around a known bottleneck. Order of operations:

process-mapper first → capacity-planner second. Hiring around the

wrong constraint wastes the hires.

  • business-growth/cs-coverage (if it exists) sizes Customer

Success coverage by ARR/CSM ratio and segment. This skill sizes by

queued work volume (tickets, cases, escalations). For a CS team

that handles both relationship work AND a ticket queue, run both.

Forcing-question library (Matt Pocock grill discipline)

Discipline: walk these one at a time. Do not skip ahead. Answers must

be written down. If you can't answer one, that is your next investigation.

Q1 — "What is your bottleneck, and have you confirmed it empirically?"

Recommended answer: a named, measured stage in the workflow with

queue-time data showing where work waits. Not a vibe. Not "escalations

take too long". An actual measured queue.

Why it's the first question: Goldratt (The Goal, 1984) — every

system has exactly one binding constraint at a time. Sizing around the

wrong constraint wastes hires entirely. If you do not know your

bottleneck, run process-mapper BEFORE this skill.

Canon: Eli Goldratt, The Goal (1984); Reinertsen, *Principles of

Product Development Flow* (2009).

Q2 — "What service trade-off are you accepting?"

Recommended answer: a written, explicit choice — fast vs. empathetic,

broad vs. deep, low-cost vs. high-quality. Frances Frei is unambiguous:

you cannot win all four. The team that tries wins zero.

Why it matters: AHT, SLA, and shrinkage inputs are the operational

expression of this trade-off. If they don't agree (e.g., you set AHT for

"empathy" but SLA for "speed"), the plan is internally inconsistent.

Canon: Frances Frei & Anne Morriss, Uncommon Service (HBR Press,

2012).

Q3 — "What's your demand P90, and what's the gap to your P99?"

Recommended answer: two specific numbers from the last 90 days of

data, with the calendar context of each (e.g., "P90 was 480 tickets/day

on normal Tuesdays; P99 was 720 on the day after the November release").

A team sized to P50 misses SLA half the time. A team sized to P99

overstaffs by 30-50%. P90 is the right operating sizing point per

Cleveland.

Canon: Brad Cleveland, Call Center Management on Fast Forward (4th

ed., 2019); A.K. Erlang, *The Theory of Probabilities and Telephone

Conversations* (1909).

Q4 — "At your planned utilization, what is P(SLA breach) at P90 and at P99?"

Recommended answer: two probabilities, computed (not guessed) from

Erlang-C with your specific N, AHT, and SLA target. If P(breach at P90)

> 10% you are understaffed at the sizing point. If P(breach at P99) >

50% you have no surge plan and the next peak event will be visible to

the CEO.

Canon: Erlang (1909); Hopp & Spearman, Factory Physics (3rd ed.,

2008), VUT equation.

Q5 — "Have you budgeted replacement hires for the attrition you'll see this year?"

Recommended answer: yes, with a specific number. At 30% annual

attrition (Bersin BPO midpoint), a 20-FTE team loses ~6 people this year.

If your "add 5 net" plan is actually a "hire 11" plan, the recruiting

volume changes drastically. Anti-pattern #3.

Canon: Bersin/Deloitte talent benchmarks (2015-2023); Edward Lawler,

Strategic Workforce Planning (USC CEO, 2008).

Q6 — "When does span of control trigger a manager hire, and who is the candidate?"

Recommended answer: a specific quarter (from hiring_sequencer.py)

and at least one identified candidate (internal lead or external hire).

Past 7 ICs/manager, 1:1s degrade, feedback cycles slip, attrition

climbs. Past 10 you have a coverage crisis. Hire the manager BEFORE

crossing 10, not after.

Canon: Camille Fournier, The Manager's Path (O'Reilly, 2017),

ch. 5; Andy Grove, High Output Management (1983).

Q7 — "What is your surge plan for the P99 day?"

Recommended answer: an explicit, documented plan — overflow tier,

BPO contracted capacity, on-call rotation, executive escalation tree,

OR a written degradation contract that says "on P99 days we extend SLA

to X minutes and notify customers proactively". If the answer is "we'll

figure it out", the P99 day is a fire visible to the board.

Canon: Hopp & Spearman, Factory Physics (2008); Reinertsen (2009)

on capacity-margin discipline.


**Walk these seven in order. One at a time. Write the answers down. The

plan you submit is only as defensible as your answers to these seven

questions.**

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。

它属于哪个仓库

星标★ 26,030
本站分层T1
该仓技能数846
原文件路径business-operations/skills/capacity-planner/SKILL.md

同一个仓库里的其他技能

看这个仓库的全部 846 个技能

同名技能的其他版本

有 2 个不同仓库或目录里都有叫 capacity-planner 的技能。它们内容并不相同,别混用: