context-engineering
Context window monitoring and budget management. Keeps orchestrator at 15-30% context usage while subagents get full 200k tokens. Provides warnings …
它会碰到什么
逐条看命中(1 条严重或高危)
- 严重
SKILL.md:3perm-wildcardallowed-tools: Read Bash(*)
这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。
技能内容
- Subagents: Get full 200k tokens of fresh context per spawn.
- Context budget: Plan how much context each wave of execution will consume.
This skill provides:
- Context window usage estimation for the current session
- Warning injection at configurable thresholds (70%, 85%, 95%)
- Orchestrator budget enforcement
- Subagent context allocation recommendations
- Context-aware summarization triggers
- Stale context detection and pruning suggestions
- Wave-level context budget planning
Capabilities
1. Context Usage Estimation
Estimate current context window usage based on conversation history size:
Tokens used: ~45,000 / 200,000
Usage: 22.5%
Status: HEALTHY
Next threshold: 70% (warning) at ~140,000 tokens
Estimation methods:
- Character count / 4 (rough approximation)
- Tool output tracking (each tool call adds to context)
- File read accumulation tracking
2. Threshold Warnings
Inject warnings at configurable thresholds:
[CONTEXT 70%] Warning: Context window at 70%. Consider summarizing completed work.
[CONTEXT 85%] Critical: Context window at 85%. Spawn new subagent for remaining work.
[CONTEXT 95%] Emergency: Context window at 95%. Wrap up immediately. Write state and exit.
Actions per threshold:
- 70%: Suggest summarizing completed work, pruning stale context
- 85%: Strongly recommend spawning new subagent with fresh context
- 95%: Emergency wrap-up: write STATE.md, commit, create continue-here.md
3. Orchestrator Budget Enforcement
Monitor orchestrator-specific budget:
Target orchestrator usage: 15-30%
Current orchestrator usage: 18%
Remaining budget: 12% (~24,000 tokens)
Budget allocation:
- Phase context loading: 5% (PROJECT, ROADMAP, STATE)
- Agent spawn overhead: 3% per agent
- Result processing: 2% per agent result
- State updates: 1%
4. Subagent Context Allocation
Recommend context allocation for subagent spawns:
Agent: gsd-executor
Available context: 200,000 tokens (fresh)
Recommended loading:
- Plan file: ~2,000 tokens
- Relevant source files: ~15,000 tokens
- Project context: ~3,000 tokens
- Remaining for execution: ~180,000 tokens
5. Context-Aware Summarization
Trigger summarization when context is filling:
Summarization triggers:
- Tool output > 10,000 characters: summarize before continuing
- File read > 5,000 lines: extract relevant sections only
- Agent result > 20,000 characters: summarize key outcomes
Summarization strategies:
- Completed work: Replace detailed execution logs with summary
- File contents: Replace full file reads with relevant excerpts
- Agent results: Extract key outcomes, discard detailed reasoning
6. Stale Context Detection
Identify context that is no longer relevant:
Stale context candidates:
- File contents read 10+ interactions ago
- Agent results from completed (not current) phases
- Tool outputs that were informational only
- Research documents already synthesized into plans
7. Wave-Level Budget Planning
Plan context budget across execution waves:
Wave 1 (3 parallel agents):
Spawn cost: 3 * 3% = 9%
Result processing: 3 * 2% = 6%
Wave total: 15%
Wave 2 (2 parallel agents):
Spawn cost: 2 * 3% = 6%
Result processing: 2 * 2% = 4%
Wave total: 10%
Total orchestrator budget needed: 25%
Target: 30% -> Sufficient with 5% margin
Tool Use Instructions
Checking Context Usage
- Use
Bashto estimate current session token count if available - Track cumulative tool output sizes during the session
- Calculate percentage against 200,000 token window
- Return usage report with threshold proximity
Injecting Warnings
- Compare current usage against configured thresholds
- If threshold exceeded, format appropriate warning message
- Include recommended action based on threshold level
- For 95%: include emergency state-save instructions
Planning Wave Budgets
- Use
Readto load plan files for the phase - Count agents needed per wave
- Estimate per-agent spawn and result cost
- Sum wave costs and compare to orchestrator budget target
- Recommend wave splitting if budget exceeded
Process Integration
execute-phase.js- Monitor context during multi-wave execution, trigger summarization between wavesiterative-convergence.js- Track context across convergence iterations, spawn fresh agents when context fillsnew-project.js- Budget context for parallel research agents (4 spawns + synthesis)
Output Format
{
"operation": "check|warn|plan|summarize",
"status": "healthy|warning|critical|emergency",
"usage": {
"estimatedTokens": 45000,
"maxTokens": 200000,
"percentage": 22.5,
"nextThreshold": 70
},
"recommendation": "Continue normally|Summarize completed work|Spawn new agent|Emergency wrap-up",
"waveBudget": {
"totalWaves": 2,
"estimatedOrchestratorUsage": 25,
"withinBudget": true
}
}
Configuration
| Setting | Default | Description |
|---------|---------|-------------|
| contextWarningThreshold | 70 | Warning threshold percentage |
| contextCriticalThreshold | 85 | Critical threshold percentage |
| contextEmergencyThreshold | 95 | Emergency threshold percentage |
| orchestratorBudgetTarget | 30 | Target max orchestrator context % |
| agentSpawnCost | 3 | Estimated % per agent spawn overhead |
| agentResultCost | 2 | Estimated % per agent result processing |
| autoSummarize | true | Auto-trigger summarization at thresholds |
Error Handling
| Error | Cause | Resolution |
|-------|-------|------------|
| Token estimation inaccurate | Approximation drift | Use conservative estimates (overestimate usage) |
| Budget exceeded mid-wave | Underestimated agent costs | Defer remaining agents to next session with continue-here.md |
| Emergency threshold hit | Orchestrator doing too much work inline | Immediately write state, commit, create handoff document |
| Stale context false positive | Context still needed | Maintain a "pinned context" list that is never pruned |
Constraints
- Token estimates are approximations (character/4 heuristic); always err on the side of caution
- Never discard context that has not been persisted to disk (STATE.md, summaries, etc.)
- Orchestrator should never exceed 30% context usage
- Emergency wrap-up at 95% is non-negotiable; quality degrades severely above this
- Wave budget planning must account for worst-case agent result sizes
- Context monitoring is advisory; it cannot forcibly stop execution
想直接用这个技能?
本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。
它属于哪个仓库
library/methodologies/gsd/skills/context-engineering/SKILL.md同一个仓库里的其他技能
同名技能的其他版本
有 2 个不同仓库或目录里都有叫 context-engineering 的技能。它们内容并不相同,别混用:
- a5c-ai/babysitter — Dynamic context injection, mode switching (dev/review/research), selective loading, and st