跳到主要内容
知仓学习社ZHICANG

renovation-scope-and-budget

Turn a renovation idea into a realistic scope, budget, and sequence before you hire anyone — so you go in informed instead of getting sticker-shocke…

不碰外部(只输出文字)无严重或高危命中mohitagw15856/pm-claude-skills

它会碰到什么

扫了多少1 个文本文件,4 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

Renovation Scope & Budget

Renovations blow up on budget and timeline because people start without a clear scope — then every decision becomes a costly mid-project scramble. This turns a vague "I want to redo the kitchen" into a defined scope, a realistic budget with a contingency, and a sequence, so you can get quotes from a position of knowledge and spot when a bid is padding or the plan is drifting.

What This Skill Produces

  • A scoped breakdown — the work split into components (demo, structural, systems, surfaces, fixtures, finishes)
  • A realistic budget range — a band per component plus a contingency (renovations reliably surprise), with the big cost drivers named
  • Sequence & timeline — the order work must happen and a rough duration, including lead-time items
  • Decide-early choices — the selections that must be locked before work starts to avoid costly changes
  • Where it balloons — the classic overrun sources (moving plumbing/walls, hidden damage, spec creep, permits)
  • Pre-quote prep — what to define so quotes are comparable and you're not scoped

Required Inputs

Ask for these if not provided:

  • The project — what you want to renovate and the rough vision
  • The space — size, age of home, current condition
  • Budget reality — what you hope to spend and how firm
  • Scope ambition — cosmetic refresh vs. gut/structural changes
  • Location & constraints — region (prices/permits), DIY appetite, timeline, living-through-it or not

Framework: Scope It, Band It, Sequence It

  1. Define the scope precisely. Break the vision into concrete components — vague scope is what quotes exploit and budgets miss.
  2. Budget in bands with contingency. Give realistic ranges per component and add a meaningful contingency (surprises are the norm, not the exception); name the biggest cost drivers.
  3. Sequence the work. Order matters (structure → systems → surfaces → finishes) and long-lead items must be ordered early — lay it out.
  4. Front-load the decisions. Identify the selections to lock before work begins; mid-project changes are where budgets and timelines die.
  5. Name the balloon risks. Moving plumbing/walls, opening up old homes (hidden damage), spec creep, and permits are the usual overruns — flag them.
  6. Prep for quotes. Tell them what to specify so bids are comparable, and treat all figures as "verify with local quotes."

Output Format

Renovation: [project] · [space] · target budget [x] · [region]

Scope

| Component | Included | Budget band |

|---|---|---|

| [demo/structural/systems/surfaces/fixtures/finishes] | | |

+ Contingency: [~10–20%].

Sequence & timeline: [order of work] · ~[duration] · long-lead items: [order early].

Decide before starting: [key selections to lock].

Where it balloons: [moving plumbing/walls · hidden damage · spec creep · permits].

Before you get quotes: [what to define so bids are comparable].

> Prices, permits, and norms are local — verify the budget with real quotes before committing.

Quality Checks

  • [ ] Scope is broken into concrete components
  • [ ] Budget is a range per component with a contingency and named cost drivers
  • [ ] Includes work sequence, timeline, and long-lead items
  • [ ] Flags the decisions to lock before starting
  • [ ] Names the common balloon/overrun sources
  • [ ] Defers final numbers to local quotes

Anti-Patterns

  • A single fixed number with no range or contingency.
  • Vague scope that quotes will exploit.
  • Ignoring sequence/long-lead items.
  • No decide-early guidance — costly mid-project changes.
  • Presenting estimates as precise across regions.

Example Trigger Phrases

  • "Help me scope and budget a kitchen renovation."
  • "How much should a bathroom remodel cost, roughly?"
  • "Plan my basement finishing project before I get quotes."
  • "What order does renovation work happen in?"
  • "Where do renovation budgets usually blow up?"

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。

它属于哪个仓库

星标★ 1,367
本站分层T1
该仓技能数3611
原文件路径plugins/pm-lifeadmin/skills/renovation-scope-and-budget/SKILL.md

同一个仓库里的其他技能

看这个仓库的全部 3611 个技能

同名技能的其他版本

有 3 个不同仓库或目录里都有叫 renovation-scope-and-budget 的技能。它们内容并不相同,别混用: