跳到主要内容
知仓学习社ZHICANG

release-day-countdown

Plan an independent music release backwards from release day — the 8-week countdown with distributor upload deadlines flagged, playlist pitch window…

不碰外部(只输出文字)无严重或高危命中mohitagw15856/pm-claude-skills

它会碰到什么

扫了多少1 个文本文件,6 KB
它会碰到什么不碰外部(只输出文字)
命中总数0 处
命中统计严重 0 · 高 0 · 中 0 · 低 0

这一栏是扫描器报的事实,不是结论。命中多不等于有毒(安全工具、规则库、示例脚本本来就会包含危险写法),命中少也不等于干净。它和你手上的凭据、文件、网络有什么关系,需要你自己看。

技能内容

Release Day Countdown Skill

Most independent releases happen twice: the day the song goes live to 40

streams, and the month later when the artist learns what they should have

done eight weeks early. The machinery has real deadlines — distributors

need lead time, editorial playlist pitching closes before release day,

content is impossible to batch once the week arrives — and none of it is

complicated; it's just sequenced. This skill runs the sequence backwards

from the date (or forwards to pick a date honestly), with every

platform-specific number flagged as check-current, because lead times and

pitch windows change and a plan built on stale specifics is a plan built

on sand.

What This Skill Produces

  • The 8-week countdown, week by week: distribution upload, metadata

and credits, pitch windows, content batching, outreach waves — each with

its why and its check-current flag where platforms set the rule

  • An asset checklist: audio master, artwork at spec, canvas/visualizer,

lyric assets, press photo, the bio paragraph — with the "before upload"

vs "before release" split

  • The pitching plan: editorial (via the distributor/platform tools,

submitted early), independent curators (researched, personalized,

no-pay-for-play flagged as the scam it usually is), and the local/press

angle from [[press-kit-epk]]

  • A release-week runbook: day-by-day, including the two moves that

outperform everything (thanking early sharers personally, and the

day-3 content drop when the algorithm decides)

  • The honest-expectations line: what a first release's numbers

typically look like, so week two isn't despair

Required Inputs

Ask for (if not already provided):

  • The release: single/EP/album, genre, done-ness of the master and

artwork, the date (or "help me pick one")

  • The artist's current reach, honestly: platforms, follower counts, the

mailing list if any, past release numbers

  • Team of one, or help? Budget: zero, small, or real?
  • The goal, honestly ranked: streams? local gigs? label attention?

the mailing list? (The plan weights differently)

Framework

  1. Pick the date like a logistics decision. Fridays are conventional

(chart weeks) but a small artist's Tuesday can dodge the big-release

flood — decide by goal. Then anchor the two hard deadlines backwards:

distributor upload (lead times vary — check yours, typically weeks

not days) and editorial pitch close (before release; check the

platform's current window). Everything else hangs between.

  1. Weeks 8–6: finish and upload. Master finalized · artwork at spec ·

metadata and credits complete (wrong credits are forever) · upload

early — early upload is what makes editorial pitching possible at all.

  1. Weeks 5–3: batch the content while calm. The pitch text (one

paragraph: what it is, what it's like, one true story) · 10–15 content

pieces from the one song (teasers, the story behind it, the lyric

moment, the bad-first-demo comparison people love) · the pre-save

decision made honestly: pre-saves help algorithmic day-one but

annoy small audiences if over-flogged — one ask, two reminders, done.

  1. Weeks 2–1: outreach in person-sized batches. Independent curators

researched (right genre, real playlists with real listeners),

personalized two-line pitches · local press/radio with the EPK · the

mailing list gets the real story, not the marketing copy — the list is

the only channel the artist owns, treat it best.

  1. Release week: the runbook, not vibes. Day 0: everything live,

links verified, the personal-thanks discipline starts (every share

answered by name — it's the highest-ROI hour in music marketing).

Day 3: the held-back content drop. Day 7: numbers reviewed against

honest expectations, thank-you post, and the next release sketched —

because catalogs compound and one-offs don't.

Output Format

## The countdown — [release] on [date]
| Week | Must ship | Platform deadlines (check-current) | Content batch |

## Asset checklist
[Before-upload set · before-release set · specs flagged check-current]

## Pitching plan
[Editorial route · curator shortlist criteria + the 2-line pitch ·
press/local via EPK · the no-pay-for-play warning]

## Release week runbook
[Day by day · the personal-thanks discipline · the day-3 drop]

## Honest expectations + next
[What week one typically looks like at your reach · the catalog note]

Quality Checks

  • [ ] Every platform-specific number (lead times, pitch windows, artwork

specs) carries a check-current flag — zero asserted as timeless fact

  • [ ] The countdown fits the real date; if the date makes editorial

pitching impossible, the plan says so and offers the honest choice

(move the date or skip that channel)

  • [ ] Content is batched before week 2 in the plan — nothing creative is

scheduled for release week itself

  • [ ] The pay-for-playlist warning appears in the pitching plan
  • [ ] Expectations are calibrated to the artist's actual current reach

Anti-Patterns

  • [ ] Do not build the plan around going viral — the plan works at 40

streams and scales if lightning hits, not the reverse

  • [ ] Do not recommend paid playlist placement or stream-farming — flagged

as harmful (platforms penalize it), not just tacky

  • [ ] Do not schedule daily begging posts — the ask-budget is finite;

story content spends it better than reminders

  • [ ] Do not skip credits/metadata rigor — it's the least fun item and

the most permanent

  • [ ] Do not let release day end the plan; the day-7 review and next-

release sketch are in the runbook

Related

[[press-kit-epk]] for the outreach attachment; [[band-agreement]] before

the money arrives; [[clip-factory]] turns the one song into the fifteen

pieces; [[content-calendar]] for the ongoing rhythm after.

想直接用这个技能?

本站把开放许可(MIT / Apache 等)的技能按仓库打包整理到网盘,点一下转存到你自己的网盘,不用一个个从 GitHub 拉。许可未声明的技能只给原始仓库链接,不打包。

同名技能的其他版本

有 3 个不同仓库或目录里都有叫 release-day-countdown 的技能。它们内容并不相同,别混用: